Similar Projects
DFS Bridgewater Administration Building and Quonset Hut Mechanical and Fire Alarm Upgrades
Alteration
Sub-Bidding
$1,738,263 est. value
Bridgewater, MA 02324

DFS Bridgewater Administration Building and Quonset Hut Mechanical and Fire Alarm Upgrades
Alteration
Sub-Bidding
$1,738,263 est. value
Bridgewater, MA 02324

Bathroom Exhaust System. Install New Exhaust Systems in Bathrooms at Standish/Olmsted Complex
Post-Bid
Less than $46,800 est. value
Plymouth, MA

Generator Replacement at Salt Works Road and Terry Lane Pump Stations - General Bid
Post-Bid
Less than $500,000 est. value
Wareham, MA 02571

Student Center Plumbing Relocation Project
Results
$76,600 est. value
Brockton, MA 02302

Pump Station Duct Cleaning and Repairs
Results
$468,000 est. value
Hingham, Quincy, MA 02043

Generator Replacement at Salt Works Road and Terry Lane Pump Stations - Filed Sub-Bid
Post-Bid
Wareham, MA 002571

Student Center HVAC Unit Replacement Project
Results
$10,000 to $50,000 est. value
Brockton, MA 02302

Water Treatment Plant Chlorine System Improvements - Sub Bid
Post-Bid
Less than $750,000 est. value
Lakeville, MA 02347

Electrical Contractors
Term Contract
Results
Brockton, MA 02301

Gas Fireplaces Fourth Cliff Recreational Area
Post-Bid
Humarock, Scituate, MA 02047

Source Capture Vehicle Exhaust System
Results
$60,000 est. value
West Bridgewater, MA 02379

Air Vent Cleaning of Aviation Hangars
Post-Bid

Electrical Work for a Pre-Metal Building - General Bids
Results
Less than $15,000 est. value
West Bridgewater, MA 02379

HVAC and Mechanical Products
Term Contract
Post-Bid

Reported 04/08/2022 12:00 AM
Project Title

Scituate HS Locker Room Renovation Phase 1

Physical Address View project details and contacts
City, State (County) Scituate, MA 02066   (Plymouth County)
Category(s) Single Trades
Sub-Category(s) Electric, Flooring, HVAC, Plumbing
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value $710,000
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the demolition of the existing boy’s locker room, showers, toilet rooms, and office space and the construction of the new boys’ and girls’ physical education locker rooms including separate toilet and shower facilities, and two associated offices. Deduct Alternate 1 includes the deletion of Phenolic Core Toilet Compartments and the addition of Plastic Toilet Compartments.

Details

Division 09 - Finishes, Flooring.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents