Similar Projects
2021 Sewer Rehabilitation Project
Infrastructure
Bidding
Hershey, PA

2021 Sewer Rehabilitation Project
Infrastructure
Bidding
Hershey, PA

Penn Hills 2019 CCTV Inspection Contracts - Contract B
Post-Bid
Pittsburgh, PA 15123

Stormwater Improvement Project
Post-Bid
Tremont, PA 17981

Sanitary Sewer Lining
Results
$175,000 est. value
Sharon Hill, PA 19079

Dunn Avenue Storm Sewer Repairs
Results
Washington, PA 15301

Leiszs Bridge Road Interceptor Replacement Project
Infrastructure
Bidding
Reading, PA 19605

2020 Storm Sewer CIPP Rehabilitation
Renovation
Post-Bid
Glen Mills, PA 19342

Harford Road Mulch Trail and Stormwater Pipe and Structures
Results
Wayne, PA 19087

Greenfield Road Drainage Project
Infrastructure
Bidding
Lancaster, PA 17573

Storm Sewer Project In Dunbar Township
Post-Bid
Uniontown, PA 15401

Crestview Drive Sanitary Sewer Extension Project
Results
Sharpsville, PA 16150

Sanitary Sewer Spot Repair Between CC MH-40 to CC MH-41
Infrastructure
Bidding
PA

Clinton Street Interceptor Rehabilitation Project
Post-Bid
Johnstown, PA 15901

Clay Street Sewer Separation Contract
Results
Pittsburgh, PA 15215

Last Updated 08/30/2021 10:48 AM
Project Title

Highland Park Area and Blews Acres Pressure Sewer System

Physical Address View project details and contacts
City, State (County) New Castle, PA   (Lawrence County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Install, and conduct performance testing of approximately 73 package grinder pump units and associated HDPE low pressure force mains and service laterals ranging from 1-1/4 inch to 3- inches in diameter. It is the contract intent that all low pressure force mains and road crossings for laterals be installed by way of horizontal directional drilling. Bids shall include coordinating the location of each grinder pump station with each property owner, installation of package grinder pump systems including electrical wiring between the grinder pump unit and the grinder pump control panels, locating and installation of the grinder pump control panel, installation of low pressure service laterals from the grinder pump unit to the curb box, installation of new public low pressure force main and associated cleanout structures and lateral connections, connection of low pressure force main to existing public gravity sanitary sewer infrastructure, testing each grinder system, and all site restoration.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents