Similar Projects
Last Updated | 12/05/2022 10:38 AM |
Project Title | Perris Valley Pipeline Interstate 215 Crossing |
Physical Address | View project details and contacts |
City, State (County) | Perris, CA 92570 (Riverside County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dam/Tunnel, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Request for Qualifications, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $59,489,720 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of constructing approximately 3,000 linear feet of 97-inch diameter welded steel pipe, installed in steel casing by micro-tunneling and cut and cover, connecting adit tunnel and four shafts, access manholes, cathodic protection test stations, geotechnical instrumentation and monitoring, groundwater management and treatment, offsite disposal of excavated materials, demolition of existing wells, removal of existing bulkheads, hydrotesting, pipeline disinfection, traffic control, site restoration, permits, and all appurtenant work as specified and shown on the drawings. Estimated cost of contract. Metropolitan expects the total cost of construction to range between $60,000,000 and $70,000,000. This estimate is intended to serve merely as a guideline of the magnitude of work. Neither the bidders nor the Contractor shall be entitled to claims because of any inaccuracy in the estimated cost range. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |