Similar Projects
Potawatomi Tower Revitalization
Infrastructure
Conception
$1,000,000 CJ est. value
Sturgeon Bay, WI 54235

Walk, Bike and Eggsplore Egg Harbor Const / Misc Ped / Bike Trail
Infrastructure
Design
$2,000,000 to $3,000,000 est. value
Egg Harbor, WI 54209

Walk, Bike and Eggsplore Egg Harbor Const / Misc Ped / Bike Trail
Infrastructure
Design
$2,000,000 to $3,000,000 est. value
Egg Harbor, WI 54209

Facilities and Parks Maintenance Garage Addition and Remodel
Addition, Demolition, Renovation, Infrastructure
Bidding
$650,000 CJ est. value
Sturgeon Bay, WI 54235

2022 Parking Lot Improvements - Sister Bay Campus
Infrastructure
Post-Bid
$120,000 est. value
Sister Bay, WI 54234

Asphalt Replacement Program
Infrastructure
Post-Bid
Sturgeon Bay, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Asphalt Sidewalk Construction
Results
Jacksonport, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

South Duluth Avenue Apartments
New Construction, Infrastructure - 77,680 SF
Pending Verification
$22,000,000 CJ est. value
Sturgeon Bay, WI 54235

Egg Harbor Road Rental Townhomes / Cherry Tree Terrace & Apple Tree Terrace
New Construction, Infrastructure
Pending Verification
$23,000,000 CJ est. value
Sturgeon Bay, WI 54235

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

2021 Alley Reconstruction
Results
$664,705 est. value
Whitefish Bay, WI

Construct Boat Access Parking Area Rowleys Bay
Infrastructure
Construction
$178,000 CJ est. value
Ellison Bay, WI 54210

Last Updated 11/16/2022 09:16 AM
Project Title

2022 Utility and Street Construction - Cherrywood Lane

Physical Address View project details and contacts
City, State (County) Sister Bay, WI 54234   (Door County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $1,141,368 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Project Category Code: Sewer and Water Construction, Stormwater Improvements, Excavation, Sidewalks/Curbs/Gutters, Storm Drain and Paving, Utility Street Construction and Excavation, Paving (Asphalt or Concrete) The project includes the following in accordance with the plans and specifications. 1,050 LF New Street Construction, 950 LF 8-inch Sanitary Sewer, 1,400 LF Curb & Gutter, 4,200 SF Concrete Sidewalk, 1,840 LF 8-inch Water Main, 4,000 SY Asphalt Pavement, 3,200 CY Rock Excavation, 1,350 LF 12-inch to 30-inch Storm Sewer, 4,100 CY Pond Excavation

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents