Similar Projects
Culver Road Sanitary Sewer Extension Project
Infrastructure
Bidding
$220,000 CJ est. value
Tuscaloosa, AL 35401

Portable Storm Shelter
New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Tuscaloosa, AL 35401

Campus Area Water Distribution System and Instrumentation Upgrades - Proposal "C" Project
Post-Bid
Tuscaloosa, AL

Raw Water Pump Station Improvements
Renovation
Post-Bid
Tuscaloosa, AL

Clinical Services & Research MRI Addition - Early Foundation
Results
$950,000 est. value
Tuscaloosa, AL 35404

Maintenance Grounds Office Demolition
Demolition
Results
$172,200 est. value
Tuscaloosa, AL

Element Hotel / Tuscaloosa
New Construction, Infrastructure
Pending Verification
$27,000,000 CJ est. value
Tuscaloosa, AL 35401

Peninsula Subdivision
New Construction, Infrastructure
Pending Verification
$3,910,000 CJ est. value
Tuscaloosa, AL 35406

Planing, Resurfacing, and Traffic Stripe on CR-84 (Charlie Shirley Road)
Infrastructure
Bidding
$1,437,070 CJ est. value
Northport, AL 35473

Campus Area Water Distribution System and Instrumentation Upgrades - Proposal D - Water Booster Station
New Construction
Post-Bid
Tuscaloosa, AL

Hilliard N. Fletcher WRRF Raw Sewage Pump Station Improvements
New Construction
Results
$61,500 est. value
Tuscaloosa, AL

Fit Foodz / Tuscaloosa
Addition, Renovation, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Tuscaloosa, AL 35401

2020 Holt Sanitary Sewer Expansion Project
Infrastructure
Bidding
$680,000 CJ est. value
Holt, AL 35404

Lift Station 10 Upgrade: Equalization Tank
Renovation
Post-Bid
Tuscaloosa, AL

2021 Boring Services Project
Infrastructure
Results
Less than $50,000 est. value
Tuscaloosa, AL

Last Updated 09/20/2022 08:07 AM
Project Title

Ed Love Raw Water Upgrades Phase 1 Construction

Physical Address View project details and contacts
City, State (County) Tuscaloosa, AL 35401   (Tuscaloosa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding Closed, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $450,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contact the owner directly to get post bid information. Award of the contract will be made within sixty (60) calendar days from the date of the bid opening. The Project shall be known as Ed Love Raw Water Pump Station Improvements Project and the general character of said public works project shall consist of the following: Upgrade the Ed Love Raw Water Pump Station Replace three (3) existing 200 HP and three (3) existing 350 HP pumps with four (4) 10,500 gpm, 500 HP pumps. The project also includes the construction of a new electrical building, a bypass pumping system and all appurtenances necessary for completion of construction. Time of Construction: From the date stated in the Notice to Proceed, the Project time of construction is 540 consecutive calendar days. Each bidder must submit with its bid a cashier's check drawn on an Alabama bank or a fully executed bid bond on the form that is contained in the Contract Documents executed by a surety company duly authorized and qualified to make bond in the State of Alabama. All bonds, sureties and/or cashier checks will be made payable to the City for an amount not less than 5 percent of the City's or its engineers or architects estimated cost of the Project or of the total bid in the proposal, but in no event more than $10,000.00.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents