Similar Projects
Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

SR 134 - Bridge Preservation
Renovation, Infrastructure
Design
$530,000 est. value

Two Lane Resurfacing
Infrastructure
Bidding
$3,399,242 CJ est. value
Batavia, OH 45103

Two Lane Resurfacing
Infrastructure
Bidding
$3,399,242 CJ est. value
Batavia, OH 45103

Miami Township Riverview and Paxton Ramsey Parks Resurfacing Project
Post-Bid
Loveland, OH 45140

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

Charity Street Reconstruction
Results
$367,269 est. value
Bethel, OH

2021 Street Repair Program
Results
OH

RFP Engineering - Water Main Replacement 2023 Project Bundle 4
Infrastructure
Pending Verification
$400,000 CJ est. value
Cincinnati, OH 45202

Pierce Township Parks Site Improvements
New Construction, Infrastructure
Bidding
$613,800 est. value
OH

Crack and Joint Sealant (MBE Only)
Term Contract
Post-Bid

Chilo Street Improvements
Results
$88,829 est. value
Chilo, OH

Goshen Township Road 74 Resurfacing Project
Infrastructure
Post-Bid
Goshen, OH

Gay Street Reconstruction Phase 2
Results
$944,828 est. value
Williamsburg, OH

Goshen Township Fire Station
Infrastructure
Post-Bid
$492,671 est. value
Milford, OH 45150

Last Updated 07/28/2022 03:02 PM
Project Title

2022 Paving Program

Physical Address View project details and contacts
City, State (County) Goshen, OH 45122   (Clermont County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $936,640 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: The milling, repaving, and full-depth repairs on various streets within Goshen Township. Information and Bidding Documents for the Project can be found and downloaded at the website Electronically. All official notifications, addenda, and other Bidding Documents will be offered through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the Issuing Office of Choice One. The Contractor shall be required to pay not less than the minimum wage rates established by the Federal Labor Standards Provisions and Davis-Bacon Wages. The project will be awarded contingent upon OPWC approval which is expected on or around July 1, 2022. Work may not begin until after this date. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Substantial Completion Date: November 4, 2022 Final Completion Date: November 18, 2022 Engineer's Estimate: $1,064,119.00 for the base bid and $1,487,879.00 for the base plus alternates

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents