Similar Projects
Emergency Generators
Alteration
Bidding
Herriman, Salt Lake City, West Jordan, UT 84081

HCI Upgrade Emergency Transfer Switch
Alteration
Bidding
$911,527 est. value
Salt Lake City, UT 84112

West Temple Street Lighting
Post-Bid
Salt Lake City, UT 84115

Photovoltaic Panels: Sales, Installation, and Maintenance AVL - 3
Post-Bid
Salt Lake City, UT 84114

State of Utah Theater and Theatrical Lighting
Term Contract
Results
Salt Lake City, UT 84114

Oak Hollow Elementary School Daylighting Upgrade
Results
Draper, UT 84020

Generator Load Bank Testing
Term Contract
Bidding
Salt Lake City, UT

Rendon Terrace Apartments Generator Installation and Energy Efficiency Upgrades
Post-Bid
Salt Lake City, UT 84116

Electrical Contractor for Public Works Projects
Results
South Jordan, UT 84095

DFCM Construction-Pre Qualified Electrical-DNR East Building Replace Switchgear
Alteration
Bidding
$165,000 est. value
Salt Lake City, UT 84116

Yamaha Generators
Post-Bid
Sandy, UT 84070

Draper Park Middle Electric Service for Portable Classrooms
Results
$70,000 to $80,000 est. value
Draper, UT 84020

Install Poles and Extend Existing Towers for SCADA System
Post-Bid
Riverton, UT 84065

New Oxygen Generator or Repair Old Oxygen Generator at Wahwheap Fish Hatchery
Results
$20,000 to $50,000 est. value
Salt Lake City, UT 84114

SLCC LAC Can Lighting Upgrade
Post-Bid
$125,000 est. value
Salt Lake City, UT 84123

Last Updated 09/14/2021 01:41 PM
Project Title

Holiday Light Installation and Removal

Physical Address View project details and contacts
City, State (County) South Jordan, UT   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project work includes install approximately 3,000 strands of standard LED holiday lights on approximately seventy (70) trees along the Towne Center area near City Hall (see Exhibit A – Map). Light strands are 24 feet per strand, soft-white LED. South Jordan will provide the lights. Installation must be completed and functional by November 20, 2020. Removal must begin the first week in January and be completed no later than February 5, 2021. Extension cords will be provided for trees located closest to City Hall. All other trees along Towne Center Drive have an individual electrical outlet.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents