Similar Projects
Patterson Road Sidewalk
Infrastructure
Design
$250,000 est. value
Columbia, SC 29209

Parking Lot R Construction
Infrastructure
Bidding
$3,000,000 to $3,500,000 est. value
Greenville, SC 29607

Willie Robinson Park Fence Reset and Walking Track Construction
Infrastructure, Alteration
Bidding
$65,000 to $90,000 est. value
Blair, SC 29015

Parking Lot Restoration Services
Post-Bid
Columbia, SC

Paving of Two (2) Concrete Parking Pads
Post-Bid
Cross Hill, SC

Asphalt Work-Two Locations
Results
Fort Mill, SC 29715

Horizontal Sidewalk Cutting
Results
Charleston, SC

CVS #2555 - ADA Site Renovations
Renovation - 4,500 SF
Construction
Gaffney, SC 29341

Campbell - Renovate Housing Unit for Office Space - Parking Lot Improvements
Infrastructure
Bidding
$350,000 to $450,000 est. value
Columbia, SC 29210

Summerville ES Bus Loop and vehicular Parking Lot
Post-Bid
$600,000 to $750,000 est. value
Summerville, SC 29483

Expand Sideway and Ramp
Results
Cheraw, SC 29520

Lot Maintenance Services
Term Contract
Post-Bid
Greenville, SC

Goethe Shults Phase 2 Sidewalks
Results
Bluffton, SC 29910

Sidewalk Improvements
Post-Bid
Conway, SC

Main Campus Parking Lot and Infrastructure Renovations
Results
$250,000 to $450,000 est. value
Sumter, SC 29150

Reported 07/13/2022 12:00 AM
Project Title

Retaining Wall, Sidewalk and Stormwater Revitalization Project

Physical Address View project details and contacts
City, State (County) Salem, SC   (Oconee County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of approximately 1,750 sq. feet of existing retaining wall, 1,550 sq. feet of existing sidewalk, existing drop inlet and trench drain and related construction for the Town of Salem.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents