Similar Projects
Last Updated | 11/09/2021 08:13 AM |
Project Title | Architectural and Engineering Design Services for the 41st Street Corridor |
Physical Address | View project details and contacts |
City, State (County) | Miami Beach, FL 33141 (Miami-Dade County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The 41 st Street Corridor Revitalization project, General Obligation Bond (GOB) Project Number 40, encompasses that portion of 41st Street, between Alton Road and Pine Tree Drive, and that portion of all intersecting roads, between Alton Road and Pine Tree Drive, North to 42 Street and south to 40 Street. Work required under this RFQ must comply with the conceptual design, and will include at a minimum, enhancement of the pedestrian walkways to include shortened crosswalks, alteration of on street parking spaces, increasing public art along the street, providing bike lanes, human scale lighting, landscape to increase tree canopy, irrigation, outdoor seating, alteration of bus shelters and providing a gateway feature at both entrances of 41st Street |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |