Similar Projects
FY 22 Flooring Replacement
Post-Bid
Bismarck, ND 58503

Heart River Elementary Flooring Updates
Post-Bid
Dickinson, ND 58601

SEHSC Floorcovering Replacement
Alteration
Results
Fargo, ND 58103

Flooring Replacement
Renovation - 25,755 SF
Post-Bid
Bismarck, ND 58501

LCC Carpet Repair
Post-Bid
Minot, ND 58705

Resinous Concrete Floor Coatings
Term Contract
Post-Bid

Removal of Old Carpet and Installation of New Flooring at the BSC Aquatic Wellness Center
Post-Bid
Bismarck, ND 58501

Flooring MACC IDIQ
Infrastructure
Post-Bid
$25,000 to $100,000 est. value
Minot Air Force Base, ND

Turtle Mountain Community Schools Interior Floor Finish Updates
Alteration
Post-Bid
Belcourt, ND 58316

Rural Development Carpet and Paint
Alteration
Post-Bid
$100,000 to $250,000 est. value
Bismarck, ND 58501

Gray Vinyl Plank Tile Flooring and Installation
Term Contract
Post-Bid
Belcourt, ND 58316

North Weible Flooring
Term Contract
Post-Bid
Fargo, ND 58105

Flooring Replacement in Designated Areas at Dorothy Moses Elementary of Bismarck Public Schools
Alteration
Post-Bid
Bismarck, ND 58504

Arena Carpet - Theatre Setting
Alteration
Post-Bid
Bismarck, ND

Remove, Prepare and Install New Flooring
Term Contract
Post-Bid
Belcourt, ND 58316

Reported 04/27/2022 12:00 AM
Project Title

BIA Flooring Replacement Turtle Mountain School, Belcourt

Physical Address View project details and contacts
City, State (County) Belcourt, ND   (Rolette County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Bids by Invitation.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work consists of removal of 100,000 Square Feet of existing vinyl flooring and Supply and Replace with new vinyl flooring and rubber cove base. Owner states that contractor should expect ACM in some mastic and will ask that existing flooring in those areas be left in place and new vinyl installed over the current flooring materials.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents