Similar Projects
River Street Storm Sewer Improvements - M3635 - City Of Iowa City
Infrastructure
Conception
$600,000 CJ est. value
Iowa City, IA 52246

River Street Storm Sewer Improvements - M3635 - City Of Iowa City
Infrastructure
Conception
$600,000 CJ est. value
Iowa City, IA 52246

Steindler Orthopedic Clinic Ambulatory Surgery Center
New Construction, Infrastructure - 35,880 SF
Design
$19,200,000 CJ est. value
North Liberty, IA 52317

ON Remodel 2W for IR/CATH/EP
Addition, Demolition, Renovation, Infrastructure - 11,500 SF
Bidding
$10,000,000 CJ est. value
Iowa City, IA 52246

PCC Pavement Roundabout, Grade and Replace
Infrastructure
Bidding
$200,000 CJ est. value
Iowa City, IA 52240

Costco Wholesale #1111 - Mezzanine Breakroom Addition / Coralville
Addition, Demolition, Infrastructure - 1,660 SF
Post-Bid
$450,000 CJ est. value
Coralville, IA 52241

The Ventnor Mixed-Use Building - Bid Package #2
New Construction, Infrastructure - 141,557 SF
Post-Bid
$40,000,000 CJ est. value
Tiffin, IA 52340

Glendale Park Improvements
New Construction, Infrastructure
Results
$275,000 est. value
Iowa City, IA

Water Purification Maintenance
Term Contract
Results
Iowa City, IA 52246

PinSeekers Golf & Entertainment Facility / Tiffin
New Construction, Infrastructure - 49,022 SF
Construction
$11,000,000 CJ est. value
Tiffin, IA 52340

Kwik Trip #1213 / North Liberty
New Construction, Infrastructure - 11,056 SF
Pending Verification
$3,000,000 CJ est. value
Tiffin, IA 52340

Lower City Park Shelters and Restroom Replacement - R4358 - City of Iowa City
Demolition, New Construction, Infrastructure
Conception
$490,000 CJ est. value
Iowa City, IA 52240

Bridge Replacement on Utah Avenue SouthEast
Demolition, New Construction, Infrastructure
Bidding
$700,000 CJ est. value
Iowa City, IA 52240

Bridge Replacement on James Avenue SouthWest
Demolition, New Construction, Infrastructure
Post-Bid
$2,000,000 CJ est. value
Iowa City, IA 52246

Orchard Street Reconstruction
Infrastructure
Results
$1,220,000 est. value
Iowa City, IA

Last Updated 12/05/2022 01:22 PM
Project Title

New Century Farmstead Site Plan and Stormwater and Utility Plan

Physical Address View project details and contacts
City, State (County) Iowa City, IA 52240   (Johnson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

New Century Farmstead Site Plan and Stormwater and Utility Plan. Johnson County ("County") reserves the right to reject any and all proposals, to waive technicalities or irregularities, abandon or change the RFP process, and to enter into such contract as it shall deem to be in the best interest of the County. Johnson County received $29.3 million in federal American Rescue Plan (ARPA) funding. The Johnson County Board of Supervisors allocated this federal funding to respond to the public health and negative economic impacts of the COVID-19 pandemic, in compliance with the Final Rule from the U.S. Department of the Treasury. One such use is to make necessary investments in water and sewer infrastructure. Project EC.5.06.01 seeks to improve the Johnson County Historic Poor Farm sewer and stormwater infrastructure to prepare for the increased need from the planned New Century Farm. Johnson County desires a holistic and comprehensive approach to design for this farmstead's site plan and accompanying stormwater plan that centers on serving as a hub for the farm's operations, and a regional attraction and model of a farmer training center that includes low impact housing and an example of stormwater conservation practices. The included conceptual New Century Farmstead site plan document should serve as a touchstone document that includes extensive planning and research by the County staff and Farm Management Consultants as well as input from the Historic Poor Farm's tenants. Begin design work December 23, 2022 Completed design April 15, 2022 Deadline for submitting questions to Project Manager November 11, 2022 RFP questions will be responded by November 18, 2022

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents