Similar Projects
CDBG ADA Sidewalk and Ramp Installation Project
Bidding
Milford, MI

2022 Sidewalk and Street Repair Program
Infrastructure
Bidding
$50,000 est. value
Plymouth, MI

Bike Racks for Sidewalks
Post-Bid
Wixom, MI

Woodland Elementary Sidewalk Replacement
Post-Bid
Auburn Hills, MI

1.20 MI of Hot Mix Asphalt Shared Use Path, Concrete Sidewalk and Ramps, Pedestrian Signals and Retaining Walls
Results
MI

0.27 MI of Concrete Sidewalk and Timber Boardwalk, Benches, Trash Receptacles and Signing along Broadway Street (M-60/M-62)
Results
Cassopolis, MI

Concrete Shared-use Path, Curb, Gutter, Sidewalk and Ramps, Storm Drain and Pavement Markings on Woodward Avenue
Infrastructure
Bidding
$1,490,000 est. value
Pleasant Ridge, MI 48069

Rest Area ADA Improvement Eastern Lower Peninsula - Exterior
Post-Bid

Systematic Sidewalk Repair at VARIOUS LOCATIONS - 2021-1
Results
Less than $298,060 est. value
Grand Rapids, MI

Hot Mix Asphalt Pavement Reconstruction, Storm Sewer, Concrete Curb, Gutter, Sidewalk and Ramps, Signals and Pavement Markings on Terrace Street
Infrastructure
Bidding
$1,597,000 est. value
Muskegon, MI 49444

Hunt Elementary School Parking Lot
Post-Bid
Jackson, MI 49202

Sidewalk Repair - 2021
Results
Kentwood, MI

Pennsylvania Avenue Parking Lot and Streetscape and Beeson Sewer Extension Project
Infrastructure
Bidding
$2,000,000 est. value
Dowagiac, MI 49047

Rest Area ADA Improvement Northern Lower Peninsula -Interior
Post-Bid

2021-2022 Street And Sidewalk Repair
Results
Dearborn Heights, MI

Last Updated 05/13/2022 04:48 PM
Project Title

Northern Tier Trail Repair And Relocation

Physical Address View project details and contacts
City, State (County) East Lansing, MI   (Clinton County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and relocate 1,800 LF of the Northern Tier Trail and crackseal along the remaining 3.25 miles of the Trail. The Northern Tier Trail is a 10' wide HMA off-road pathway.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents