Similar Projects
Governors Office of Storm Recovery, Bowman Avenue Dam, Bowman Pond Clearing at Suny Purchase
Infrastructure
Bidding
$425,000 to $475,000 est. value
Purchase, Rye Brook, NY 10577

McCoy Road over Hague Brook Culvert Replacement
Alteration
Bidding
Hague, NY 12836

Aluminized Type 2 Corrugated Steel Pipe
Term Contract
Post-Bid
Schenectady, NY 12305

Corrugated Metal Pipe
Term Contract
Post-Bid
Delmar, NY 12054

Honey Hill Road Outfall Channel Restoration
Results
Fort Plain, NY

Mirror Lake Drive Sidewalk, Drainage and Pavement Improvements
Results
Less than $1,100,000 est. value
Lake Placid, NY

Timber Bridge and Culvert Materials and Salt Storage Building Materials
Term Contract
Bidding
NY

Public Works Materials
Term Contract
Post-Bid
Fonda, NY 12068

Mirror Lake Drive Sidewalk, Drainage & Pavement Improvements
Results
Less than $1,600,000 est. value
Lake Placid, NY 12946

Culvert Replacement at County Route 31 Over North Branch Snook Kill
Alteration
Bidding
NY

County Route 16 (North Quaker Lane) Road Improvement
Post-Bid
Poughkeepsie, NY 12601

Replacement of Hannibal Street over Meadow Brook
Term Contract
Results
Fulton, NY 13069

Provide Fall Levee Protection Various DEC Facilities - Water Resources
Alteration
Bidding
$500,000 to $1,000,000 est. value

On-Call Emergency Repair Services for Department of Public Works, Water and Sewer Departments
Term Contract
Post-Bid
Rensselaer, NY 12144

Where and When Structures Repair
Results
Less than $4,700,000 est. value

Last Updated 06/18/2021 08:41 AM
Project Title

Parker Road Over Breen Brook, Culvert Replacement

Physical Address View project details and contacts
City, State (County) Hadley, NY 12835   (Saratoga County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project provides for the replacement of the culvert at Parker Road over Breen Brook in the Town of Hadley, Saratoga County, New York. The work breakdown is as follows: 1. Establish maintenance and protection of traffic during construction via a local detour 2. Survey and layout of items in Contract 3. Existing culvert removal and disposal 4. Divert the Breen Brook 5. Install precast concrete box culvert and precast wing walls 6. Backfill and establish new roadway section 7. Pave new roadway 8. Install guide rail 9. Restoration of disturbed banks 10. Restore traffic to normal operating patterns.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents