Similar Projects
Albany Street Widening Phase II from 23rd Street to 37th Street
Infrastructure
Bidding
$2,700,000 est. value
Broken Arrow, OK 74011

Interchange Modification, Pavement Widening, and Bridge Turner Turnpike/i-44/Sh-66
New Construction, Infrastructure
Post-Bid

Arterial Street Rehabilitation and Waterline Replacement
Infrastructure
Post-Bid
Tulsa, OK 74127

Pavement Rehabilitation (p.c.) and Bridge Rehabilitation
Results
Tulsa, OK

Safety Improvement
Results
Tulsa, OK

Arterial Street Rehabilitation and Waterline Replacement
Infrastructure
Post-Bid
Tulsa, OK 74127

Concrete Roadway Panel Replacement with Additional Miscellaneous Concrete Work 3
Infrastructure
Results
$809,281 est. value
Broken Arrow, OK

Citywide Arterial Crack Sealing
Infrastructure
Post-Bid
Tulsa, OK

East Elementary Driveway Entrance Improvements
Alteration
Results
Tulsa, OK 74137

Paving Repair Project
Infrastructure
Post-Bid
Owasso, OK 74055

Elgin Street Improvements from 1st Street to 5th Street
Infrastructure
Results
Less than $407,417 est. value
Broken Arrow, OK

Asphalt Seal Coat Repairs
Term Contract
Post-Bid
Tulsa, OK 74115

Chip Seal (Double Treatment)
Infrastructure
Results
Tulsa, OK

Pavement Striping
Infrastructure
Results
Owasso, OK 74055

Aspen Ridge Norfolk Drive
Infrastructure
Results
$2,984,324 est. value
Broken Arrow, OK 74011

Last Updated 01/25/2022 02:52 PM
Project Title

Washington Street Improvements from Garnett Road to Olive Avenue

Physical Address View project details and contacts
City, State (County) Broken Arrow, OK   (Tulsa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Stabilization of the creek at the inlet and outlet of the installed box culvert including regrading and placing approximately 5406 tons of riprap. Add end treatments to the existing corrugated pipe outlets east and west of the creek. Place grouted riprap in existing ditch perpendicular to the creek. Complete final grading and sod east of S. Willow Ave.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents