Similar Projects
Residential Resurfacing: Area bound by N Santa Fe Ave, N Kelley Ave, NW 50th St and NW 36th St - City of Oklahoma City
Infrastructure
Conception
$2,772,500 est. value
Oklahoma City, OK

Arterial Resurfacing: N May Avenue from NW 63rd St to W Wilshire Boulevard - City of Oklahoma City
Infrastructure
Conception
$1,335,000 est. value
Oklahoma City, OK 73195

Electrical Construction Services at Mike Monroney Aeronautical Center
Alteration
Design
$500 to $1,000,000 est. value
Oklahoma City, OK 73169

Overhead Sign Structure Gantries for Will Rogers Turnpike
Term Contract
Sub-Bidding
Oklahoma City, OK 73102

Generator Maintenance and On-Call
Term Contract
Sub-Bidding
$62,000 CJ est. value
Oklahoma City, OK 73102

Emergency Generator Upgrade
Alteration
Post-Bid
El Reno, OK

Switchgear and Distribution Upgrade
Term Contract
Post-Bid
Oklahoma City, OK 73117

Installation Swap-Out of Residential Electric Meters
Alteration
Results
Ponca City, OK

Repair Kitchen Electrical System B713
Alteration
Results
Enid, OK 73703

Parking lot lights and poles for OSUIT campus in Okmulgee
Infrastructure
Sub-Bidding
$65,000 CJ est. value
Okmulgee, OK 74447

Alfalfa Electric Cooperative
Term Contract
Post-Bid
OK

Repair Hangar Lighting
Term Contract
Results
$100,000 to $250,000 est. value
Enid, OK 73703

Pole Replacements
Term Contract
Sub-Bidding
Beaver, OK 73932

High Mast Lights
Infrastructure
Post-Bid
Elk City, OK

Electrical Instrumentation and Control Services
Alteration
Results
Lawton, OK

Last Updated 06/13/2023 06:04 AM
Project Title

Traffic Signals and Striping

Physical Address View project details and contacts
City, State (County) Muskogee, OK 74403   (Muskogee County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $407,740 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of traffic signals at Shawnee Bypass (U.S. 62) and Country Club Road The bonds required will be a Performance Bond, a Payment Bond, and a Maintenance Bond, each in the full amount of the contract. The Authority will not accept letters of credit in lieu of any bond required herein.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents