Similar Projects
Water Tower 4 Rehabilitation
Alteration
Bidding
Cary, IL 60013

RLCD Elevated Water Tank Repainting or Demolition
Infrastructure, Alteration
Bidding
Waltonville, IL 62894

State Street Elevated 750,000 Gallon Tank Painting
Post-Bid
Less than $600,000 est. value
Lemont, IL 60439

Digester Bridge Truss Painting
Post-Bid
Peoria, IL 61607

Carpeting and Painting
Results
Peoria, IL 61602

Raw Water Pump Station Surge Tank Coating
Results
Green Oaks, Lake Bluff, IL 60044

GAP #0503 - Refresh
Renovation
Construction
Chicago, IL 60657

Riverview Mechanical Upgrades
Alteration
Bidding
South Beloit, IL 61080

DNR - Red Hills - Trace Inn Paint
Post-Bid
Springfield, IL 62702

UIUC Bevier Hall Window Replacement
Addition
Results
Urbana, IL 61801

Lake Street Tank and Downtown Tank Repainting
Alteration
Bidding
Grayslake, IL

Electric Equipment Painting
Post-Bid
Naperville, IL 60540

Cleaning and Painting Steel Structure
Results
Palos Heights, Worth, IL 60482

Rickelman Standpipe Recoating
Alteration
Bidding
$520,000 est. value
Effingham, IL

Main Library Interior/Exterior Painting
Post-Bid
Evanston, IL 60201

Reported 02/12/2022 12:00 AM
Project Title

Preparing and Painting MDH MALSR Fiberglass LIR Poles And Support Towers

Physical Address View project details and contacts
City, State (County) Carbondale, IL   (Jackson County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $20,000 to $42,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work on this contract is for preparing and painting the MALSR fiberglass poles and steel towers at stations 2+00 thru 24+00 and includes the following: 1. Previous to any prep work or painting, cover/protect surfaces of different colors or that are not to be painted to prevent drippage/spillage. 2. Fiberglass masts/cross-bars and supports: Inspect all surfaces to be painted and sand/wire brush any areas of loose/chipping/flaking/chalking paint or rust down to solid surface. Spray all surfaces to be painted with low-pressure solution of PPG Prep 88 or approved equal water based alkaline cleaner diluted per manufacturer instructions per specific conditions. Thoroughly wet all surfaces and allow solution to dwell per manufacturer requirements based on surface temperature. Power wash surface to remove all traces of Prep 88 and allow to dry fully. Test surface to assure the surface pH has been neutralized (7.5 maximum). Use a leaf blower to remove excess water and accelerate drying time and then allow surface to dry minimum of 2 hours. Once surface is dry and ambient temperature is at least 5 deg. F above the dew point (to prevent condensation on the newly painted surface), apply PPG Industries PSX 700 or approved equal Siloxane high gloss epoxy paint with brush or roller to the required surfaces. Mix 2-part components per manufacturer’s directions of 4 parts resin to 1 part cure. Color is aviation orange (P/N 90915003 - See LIR Paint Kit sheet at bottom of spec). 3. Steel RAIL Towers: Solvent clean surfaces to be painted per SSCP-SP1. Sand/wire brush all areas of rust, loose/scaled/peeling paint to remove any loose material down to solid surface. Assume a minimum of 6 man hours of sanding prep time per steel tower. Spray/rinse off sanding residue with low-pressure solution of PPG Prep 88 (concurrent with the fiberglass mast as outlined in Item 2. above). Use a leaf blower to remove excess water and accelerate drying time and then allow surface to dry minimum of 2 hours. Once surface is dry, spot-prime any bare metal or rust with TowerPlex CC2925 or approved equal Rust Inhibitive Waterborne Primer. Allow primer to cure per manufacturer instructions and apply 2 coats of TowerPlex (or approved equal) Aviation Orange CC2920 and Aviation White CC2919 paint to match existing color bands. Paint shall be applied and allowed to dry between coats per manufacturer’s recommendations. 4. Clean and restore site to original condition

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents