Similar Projects
Athletic Complex South Concessions Building - Electrical (Rebid)
Renovation
Post-Bid
$400,000 CJ est. value
Grand Blanc, MI 48439

AMI Meters
Alteration
Post-Bid
Flint, MI

Stadium Lights Replacement
Infrastructure
Post-Bid
$400,000 CJ est. value
Flint, MI 48505

Switchgear Maintenance
Term Contract
Post-Bid
Flint, MI 48502

Kearsley Community Schools District-wide Classroom Electrical Upgrades
Renovation
Results
$118,600 CJ est. value
Flint, MI 48502

Camera System Upgrades
Renovation
Post-Bid
$6,500 CJ est. value
Grand Blanc, MI 48439

Network Infrastructure at Genesee County Jail
Renovation
Post-Bid
$400,000 CJ est. value
Flint, MI 48502

ructured Cabling, PA/Clock, and Classroom A
Renovation
Post-Bid
$115,000 CJ est. value
Fenton, MI 48430

AED Equipment and Supplies
Renovation
Post-Bid
$240,000 CJ est. value
Flint, MI 48502

Upgrade Building Backup Generator at the Marion Crouse Instructional Center
Renovation
Post-Bid
$60,000 CJ est. value
Flushing, MI 48433

Wireless Access Points
Term Contract
Post-Bid
Flint, MI 48502

Linden Pump Station Generators
Infrastructure
Post-Bid
$349,080 CJ est. value
Linden, MI 48451

Park Electrical Infrastructure Repairs
Infrastructure
Results
$69,750 CJ est. value
Flint, MI 48502

Electric Preventative & Maintenance Program
Term Contract
Post-Bid
Flint, MI 48502

Sky light Damage
Renovation
Sub-Bidding
$640,000 CJ est. value
Davison, MI 48423

Last Updated 10/16/2023 10:40 AM
Project Title

MTA - Operations Center Lighting Upgrades

Physical Address View project details and contacts
City, State (County) Flint, MI 48503   (Genesee County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $122,300 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000330783 Work is the OPERATIONS CENTER located on the right side of the service drive as you enter the campus. The MTA is soliciting bids from qualified companies who can upgrade and install lighting at the MTA Operations Center located at 1403 S. Dort Hwy., Flint, MI 48503. The current lighting system is out of date and MTA wishes to take advantage of recent advancements in technology. Job 1401 S. Dort Highway Flint, Michigan United States 48503 Bid Intent Optional Bid Intent Deadline 09/29/2023 05:00 PM EDT Question Acceptance Deadline 10/06/2023 05:00 PM EDT Questions are submitted online No -- Direct all questions in writing to: Jesse Lambert Purchasing Agent Email: jlambert@mtaflint.org -12/1/2023 Proposed Start Work (no later than) -12/31/2023 Proposed Close-out General Requirements - Certified Payroll - Contractors License Required - Installation Required - Prevailing Wage Required - Security Badges Bonding Requirements - Bid Bond 5 % -- Each Bid shall be accompanied by a cashier's check or a bid bond by an approved surety company in the amount of five percent (5%) of the base Bid payable to the MTA and will be forfeited to the MTA on failure to enter into a contract within ten (10) days after notice of acceptance of the Bid. Successful Bidder will be required to furnish a performance bond in an amount equal to one hundred percent (100%) of the contract amount and and material payment bond in an amount equal to one hundred percent (100%) of the contract amount. Surety on such bonds shall be a duly authorized company satisfactory to the MTA. *The MTA reserves the right to reject any or all Bids and to waive irregularities or informalities as may be deemed in MTA's interest. It is the MTA's intent to award the to the lowest most qualified, responsive, and responsible Bidder for all phases of the construction work. o Comply with MIOSHA requirements at all times while on project. o Traditional Construction services, including but not limited to monitoring construction schedule, conformance to construction documents, conduct job meetings, and facilitate project closeout process. o Conform to the requirements of the pay items included in the Project Specifications. In the event of a conflict between these specifications, the Owner's Representative shall make the final determination. o Meet all Construction Specifications highlighted in this IFB. o Produce construction documents sufficient for permitting, bidding, and construction. o Provide a designated area for demolition waste containers. New material storage for equipment and parking will be provided for roofing crew during the construction. Contractor shall provide covering for such containers as to prevent public salvaging of items. Leaching of products from container vessels will not be tolerated. The Contractor shall provide all labor and materials necessary to accomplish this work. o Confine all construction and demolition including equipment placement / materials placement to and from the roof areas to within the areas designated. o No additional compensation will be permitted as a result of time extensions due to adverse weather conditions approved by the Owner's Representative. o Provide site survey locating and recording locations of existing lights including affected electrical and gas services, affected water services, and all other points of interest within MTA ceilings. o Do not use HVAC system for storage of equipment or products. All sealants glues, solvents or products of aromatic odor shall not remain open around HVAC fresh air intakes. MSDS sheets must be provided for all solvents, glues or cleaners. o Re-use of existing plugs and electrical wiring is permitted providing construction work abides by all local, state and federal construction code standards. o Lighting levels to abide by OSHA recommended standards. o Lighting fixtures and bulbs to include acceptable UL rating. o Bidder to supply all lifts, ladders and equipment required to complete scope of work. o COST A - MAIN VEHICLE GARAGE: Remove existing 250w lighting fixtures (424) and replace with LED occupancy controlled fixtures. o COST B - MAIN VEHICLE GARAGE EXIT: Remove existing 2 lamp T8 fixtures (12) and replace with LED high-bay occupancy controlled fixtures. o COST C - REPAIR GARAGE: Remove existing 250w fixtures (70) and replace with LED occupancy controlled fixtures. o COST D - PAINT BOOTH/BODY SHOP: Retrofit existing T12 lamp fixtures (66) with LED lamps. o COST E - WASH BAY: Remove existing 250w fixtures (40) and replace with LED occupancy controlled fixtures. o COST F - WASH WALL: Retrofit existing 8ft - Vapor - T12 lamp fixtures (13) with LED lamps. Remove and replace existing 250w single bulb fixtures (3). o COST G - DISPATCH CENTER: Retrofit existing T12 - 3 lamp and 2 lamp fluorescent fixtures (380) with LED lamps. o COST H - EXTERIOR PARKING LOT: Remove and replace existing 250w single bulb fixtures (39) with dual bulb LED alternatives. o COST J - EXTERIOR WALLS: Remove and replace existing 250w fixtures (64) with LED wall packs. o COST K - EXTERIOR LIGHT POLES: Retrofit existing downlights (6) with dual LED fixtures. o COST L - CAFETERIA: Retrofit existing pendant lights (26) with LED lamps. o COST M - INVENTORY ROOMS: Remove and replace existing fixtures (26) with LED occupancy controlled fixtures. Retrofit existing T12 fixtures (35) with LED lamps. o COST N - UNIFORM ROOM: Retrofit existing T12 fixtures (5) with LED lamps. o COST P - BATHROOMS/HALLWAYS/LOCKERROOMS: Retrofit existing T12 fixtures (89) with LED lamps. o COST Q - MAIN ENTRANCE/LOBBY: Retrofit existing exterior canopy lights (3) with LED lamps. Retrofit existing T12 fixtures (11) with LED lamps. o COST R - MAINTENANCE OFFICES: Retrofit existing T12 fixtures (27) with LED lamps. o COST S - ELECTRICAL ROOM: Retrofit exiting T12 fixtures (14) with LED lamps. Remove and replace existing 400w single bulb fixtures (8). o COST T - VAN WASH: Remove and replace existing 400w single bulb fixtures (12).

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents