Similar Projects
EHRM Infrastructure Upgrades Design-Build Martinez VA
Infrastructure
Design
$10,000,000 to $20,000,000 est. value
Martinez, CA 94553

Countywide Cabling Servies
Term Contract
Bidding
Oakland, CA 94612

Sewer Lift Station Electrical Modifications at Hosking Avenue / Akers Road and Bank Street / Oakdale Drive
Renovation
Sub-Bidding
$521,000 CJ est. value
Bakersfield, CA 93301

Doolan Tower Back Up Generator
Renovation
Sub-Bidding
$200,000 CJ est. value
Livermore, CA 94551

Uninterruptable Power Supply (UPS) Systems
Alteration
Post-Bid
Fresno, CA

Clovis Veterans Memorial District Memorial Auditorium
Alteration
Post-Bid
Clovis, CA 93612

New 400-Amp Panel for Future Electric Vehicle Charging Stations, and Concrete Pad for Edison's Surface Mounted Transformer & Required Conduits
Alteration
Results
Torrance, CA 90504

Low Voltage and Network Cabling
Alteration
Results
Torrance, CA 90503

E-Rate Eligible Projects: Category One Switch Equipment and Category Two Cabling
Term Contract
Sub-Bidding
Chico, CA 95928

Conduit Infrastructure For Wi-Fi Expansion
Infrastructure
Post-Bid
Los Angeles, CA 90081

LAUS Wires And Cables
Alteration
Results
Less than $1,300,000 est. value
Los Angeles, CA 90081

District-Wide Football Stadium Fiber Optic Upgrade
Infrastructure
Sub-Bidding
$150,000 CJ est. value
Bakersfield, CA 93301

2001 North Garey Avenue Power Upgrade
Infrastructure
Post-Bid
Walnut, CA 91789

North Long Beach Collection Main Control Valve Upgrade
Infrastructure
Results
$1,116,000 est. value
Long Beach, CA 90899

Install Rectangular Rapid Flashing Beacon Systems
Infrastructure
Sub-Bidding
$6,900,000 CJ est. value
Sunol, CA 94550

Last Updated 12/02/2022 06:02 PM
Project Title

Oroville Union High School District E-rate Cabling

Physical Address View project details and contacts
City, State (County) Oroville, CA 95966   (Butte County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $70,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Oroville Union High School District, California, acting by and through its Governing Board, hereinafter referred to as the District is requesting proposals, for the award of Erate contracts for the following: Category 2: Cabling FY22, This is a Public Works project and will require Bonds and Insurance. Prevailing wage rates must be paid and Certified Payroll Records submitted at the conclusion of the projects. This project requires the services of contractors holding a valid California C7 or C10 contractor's license that will be current for the entire installation. Contractor must be familiar with SB854 and its requirements. This is an Erate funded project. Vendor must participate in the E-Rate Program and must provide a Service Provider Identification Number (SPIN) and Federal Registration Number (FCC-FRN) with the proposal. This RFP is pursuant to Public Contract Codes 20118.2, 20111, and 22000. All public works projects shall be subject to compliance monitoring and enforcement by the department of industrial relations. Pursuant to California Labor Code sections 1725.5 and 1771.1 all public works contractors and subcontractors must be registered with the department of industrial relations. The Board reserves the right to reject any or all proposals and to waive informality in any proposals received, even with SLD funding approval. In addition, the district reserves the right to deny any or all proposals associated with this RFP, even with SLD funding approval. The district reserves the right to accept the pricing proposal solely dependent upon SLD approval. Contractor must contact the project manager to arrange a job start meeting to review procedures, work sequence, and tentative scheduling. Contractor shall commence work AFTER receiving a notice to proceed from the district, which will include a date and time. Contractor shall not proceed with any work on the project without a job start meeting.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents