Similar Projects
Brookwood High School - HVAC Modifications
Post-Bid
Snellville, GA 30078

HVAC Modifications for South Gwinnett High School
Post-Bid
Snellville, GA 30078

F and O Offices HVAC Renovation
Results
Lawrenceville, GA 30045

Gwinnett County Westside Police Precinct HVAC Replacement Project
Results
Less than $167,450 est. value
Norcross, GA 30071

HVAC and Mechanical Products
Term Contract
Post-Bid

Purchase of Particulate Blocking (PBI) Hoods on an Annual Contract
Term Contract
Results
Lawrenceville, GA 30042

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Gwinnett Courts Annex Ductwork Replacement and Duct Cleaning Project
Results
Lawrenceville, GA 30042

HAVC System Maintenance Services at Various County Facilities on an Annual Contract
Term Contract, Alteration
Post-Bid
Lawrenceville, GA

Gwinnett County Police Training Indoor Firing Range HVAC Upgrade Project
Results
Lawrenceville, GA 30045

RTU 1 and 2 Replacement-Building 700
Alteration
Post-Bid
Lawrenceville, GA 30043

Human Services Center Roof and HVAC Replacement
Results
Norcross, GA 30093

Comprehensive HVAC Services - Annual Contract
Term Contract
Post-Bid
Lawrenceville, GA 30045

Phillips State Prison Chiller Replacement
Results
Buford, GA 30519

Pneumatic Control System Services
Term Contract, Alteration
Results
$56,070 est. value

Last Updated 12/06/2021 01:50 PM
Project Title

Fleet Maintenance Facility HVAC Replacement Project

Physical Address View project details and contacts
City, State (County) GA   (Gwinnett County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes Replacement of four split system fan-coil units and gas fired duct furnaces with new gas fired furnaces with coiling coils. Replacement of four existing air-cooled condensing units. Replacement of one 15-ton split system air handling unit and gas-fired duct furnace with new 15-ton split system air handling unit with electric heat. This unit will also be relocated to a mezzanine to improve serviceability. Replacement of one 15-ton air-cooled condensing unit with new 15- ton outdoor air to air heat pump unit. Replacement of one split system, fan-coil unit, and outdoor heat pump unit. Replacement of thirty-seven gas-fired unit heaters. Replacement of two electric wall heaters. Replacement of one suspended electric unit heater. The HVAC equipment shall be furnished with MERV 13 filters and contain UV lights and bipolar ionizers from the factory, where available, or field installed where not available. Addition of one ductless split system heat pump to condition existing IDF Closet on mezzanine.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents