Similar Projects
Landers Center Expansion
Addition, Demolition, Renovation, Infrastructure - 175,000 SF
Design
$35,000,000 CJ est. value
Southaven, MS 38671

Silo Square - Phases 3 and 4
New Construction, Infrastructure
Design
$100,000,000 CJ est. value
Southaven, MS 38672

Lewisburg High School Band Hall Addition
Addition, Demolition, Infrastructure - 5,700 SF
Bidding
$2,000,000 CJ est. value
Olive Branch, MS 38654

Lewisburg High School Band Hall Addition
Addition, Demolition, Infrastructure - 5,700 SF
Bidding
$2,000,000 CJ est. value
Olive Branch, MS 38654

Slurry, Micro and Scrub Seal
Term Contract
Post-Bid
MS

Getwell Road Widening
Infrastructure
Post-Bid
Southaven, MS 38672

Amazon Transportation Improvements
Infrastructure
Results
Hernando, MS

Asphalt Overlay Installation
Term Contract
Results
$1,353,762 est. value
Southaven, MS

Williams Ridge Phase 2
New Construction
Construction
$30,000,000 est. value
Southaven, MS 38672

Oakridge Commons
New Construction
Pending Verification
Olive Branch, MS 38654

The Cascades Mixed Use Development
New Construction
Pending Verification
Olive Branch, MS 38654

Asphalt Paving and Milling Project for Hernando Streets 2022
Infrastructure
Post-Bid
$750,000 est. value
Hernando, MS

Asphalt Paving and Milling Contract for Old Highway 51 and Motor Scooter Drive
Infrastructure
Results
$204,070 est. value
Hernando, MS 38632

The Cascades
New Construction, Infrastructure - 400,000 SF
Pending Verification
$385,000,000 CJ est. value
Olive Branch, MS 38654

AWG Infrastructure Improvements - Overlay and Shoulder Widening of Green T Road
Infrastructure
Post-Bid
Hernando, MS 38632

Last Updated 01/09/2023 03:03 PM
Project Title

Silo Square District Lofts (Apts)

Physical Address View project details and contacts
City, State (County) Southaven, MS 38672   (DeSoto County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected January 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $50,000,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 28, 2022, this project is on hold due to cost increases. Discussions are being held on how and when to move forward. A general contractor has not been awarded. The Project consists of the construction of: Phase 1 - New 3 stories apartment building, 119,257 sf apartment building, total of 85 dwelling units. Phase 2 - New 3 stories apartment building, 119,257 sf apartment building, total of 86 dwelling units. We encourage you to submit a proposal on any scope of work in which you are interested in performing and will have the capability of performing during construction. All pricing is expected to be submitted as per plans and specifications. All substitutions must be submittal for approval 3 days prior to bid date. Scope of Work includes but is not limited to the following: Specification Sections: Divisions 2 - Existing Conditions, Division 3 - Concrete Forming and Accessories, Concrete Reinforcement, Cast-in-Place Concrete, Gypsum Cement Underlayment; Division 4 - Masonry Veneer, Stone Masonry Veneer; Division 5 - Structural Steel Framing, Metal Fabrications, Metal Stairs, Pipe and tube Railings; Division 6 - Wood Treatment, Rough Carpentry, Shop-fabricated Wood Trusses, Glued-laminated Construction, Finish Carpentry, Architectural Wood Casework, Cast Polymer Fabrications, Glass Fiber Reinforced Plastic; Division 7 - Fire and Smoke Assembly Identification, Thermal Insulation, Foamed-in-Place Insulation, Asphalt Shingles, Metal Roof Panels, Fiber-Cement Siding, Thermoplastic Polyolefin (TPO) Membrane Roofing - Carlisle, Sheet Metal Flashing and Trim, Roof Accessories, Firestopping, Joint Sealants, Expansion Joint Cover Assemblies; Division 8 - Hollow Metal Doors and Frames, Fiberglass Doors, Access Doors and Panels, Vinyl Windows, Door Hardware, Glazing , Mirrors; Division 9 - Common Work Results for Flooring Preparation, Gypsum Board Assemblies, Tiling, Resilient Flooring, Exterior Painting, Interior Painting: Division 10 - Signage, Toilet, bath, and Laundry Accessories, Fire Protection Specialties, Awnings; Division 11 - Equipment; Division 12 - Window Shades, Countertops; Division 14 - Conveying Equipment; Division 20 - Mechanical Seismic and Wind Restraints; Division 21 - Fire Sprinkler System; Division 22 - Plumbing; Division 23 - HVAC; Division 25 - Integrated Automation; Division 26 - Electrical Requirements, Low Voltage Electrical Power Conductors and Cables, Grounding and Boding for Electrical Systems, Hangers and supports for Electrical Systems, Raceways and Boxes for Electrical Systems, Sleeves and Sleeve Seals for Electrical Raceways and Cabling, Seismic Controls for Electrical Systems, Identification for Electrical Systems, Panelboards, Meter Centers, Wiring Devices, Enclosed Switches and Circuit Breakers, LED Lighting, Exteriors Lighting; Division 27 - Communications; Division 28 - Addressable Fire Alarm System. *This project is being bid by invitation only. If you have been contacted by the owner to bid on this project as a general contractor, and would like to be listed below, please notify our editorial staff.

Details

,, 238,514 SF - 3 Stories Above Grade, 119,257 SF. 3 Stories Above Grade, 119,257 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents