Similar Projects
Point MacKenzie Rail Extension Bridge Repairs
Renovation, Alteration
Results
Matanuska, AK

Parks Highway Bridge Replacements
New Construction, Infrastructure
Bidding
$20,000,000 to $30,000,000 est. value
AK

Construction Management Services for Port MacKenzie Rail Bridge Repairs
Renovation, Infrastructure
Results
Big Lake, AK

Alaska Class Ferry (ACF) to Construct 8 Single Person staterooms on the Bridge Deck
New Construction, Infrastructure
Bidding
$10,000,000 to $20,000,000 est. value
Ketchikan, AK

Remove Lead Based Paint From Bradley Bridge Girders
Alteration
Results
Less than $25,000 est. value
Trapper Creek, AK

Reported 11/18/2021 12:00 AM
Project Title

AK NPS DENA 10(49), Polychrome Pass Area Improvements

Physical Address View project details and contacts
City, State (County) Healy, AK 99755   (Denali County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Design-Build. Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value Greater than $20,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project will require a significant amount of earthwork to realign the Denali Park Road to accommodate the new bridge. A cut side retaining wall is expected to be needed to construct the east side bridge abutment. Also, all work necessary to construct a 400 foot +/- long bridge across the Pretty Rocks landslide. This includes abutment preparation and construction, acquisition and assembly of the superstructure, temporary work platform, and erection of the bridge. The proposed contract action is for a design-build construction contract. The project will consist of spanning the active Pretty Rocks landslide with a 400 foot +/- long bridge. Ground anchors will likely be needed to stabilize the rock mass at the proposed bridge abutments to achieve acceptable Factors of Safety for global stability. The new bridge will also require realignment of the Denali Park Road and a significant amount of excavation at either end of the bridge; and possibly a retaining wall at the adjacent Perlite Landslide.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents