Similar Projects
Woodshire Drive - City of Mankato
Infrastructure
Conception
$1,086,562 CJ est. value
Mankato, MN 56001

Woodshire Drive - City of Mankato
Infrastructure
Conception
$1,086,562 CJ est. value
Mankato, MN 56001

Eastwood Industrial Park Office and Warehouse Development
New Construction, Infrastructure - 50,000 SF
Design
$26,850,000 CJ est. value
Mankato, MN 56001

Eastwood Industrial Park Office and Warehouse Development
New Construction, Infrastructure - 50,000 SF
Design
$26,850,000 CJ est. value
Mankato, MN 56001

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Grading, Bituminous Mill and Overlay, Drainage and Snow Fence
Results
MN

Bituminous Surfacing, Ultrathin Bonded Wearing Course, Full Depth Reclamation
Results
MN

Harrison Ford Automobile Dealership Addition
Addition, Demolition, Infrastructure - 3,941 SF
Construction
$1,000,000 CJ est. value
Mankato, MN 56001

District 22 - APX Contractor Campus
New Construction, Infrastructure - 31,509 SF
Construction
$3,402,972 CJ est. value
Mankato, MN 56001

Frost Plaza
New Construction, Infrastructure - 5,759 SF
Pending Verification
$2,000,000 CJ est. value
Mankato, MN 56001

Cambria
New Construction, Infrastructure - 11,215 SF
Pending Verification
$2,960,760 CJ est. value
Mankato, MN 56001

Germania Park Phase 5 - City of Mankato
Infrastructure
Conception
$1,440,614 CJ est. value
Mankato, MN 56001

Jackson Park Apartments
New Construction, Infrastructure - 66,000 SF
Design
$10,000,000 CJ est. value
Mankato, MN 56001

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

Last Updated 01/20/2023 07:46 AM
Project Title

Germania Park Redevelopment Phase 4 - City of Mankato

Physical Address View project details and contacts
City, State (County) Mankato, MN 56001   (Blue Earth County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2024
Bids Due View project details and contacts
Estimated Value $2,127,844 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Germania Park Capital Improvements Plan (CIP) covers an area of Mankato generally bounded by Riverfront Drive, 1st Avenue, Trunk Highway 14 (TH 14), and the Minnesota River. The existing subsurface of this area is predominantly bedrock, which has limited the development to smaller residential developments and industrial businesses. Most of the city-owned infrastructure is original and dates 50 to 75 years in age, with the exception of Pine Street and a few residential streets on the east side of 3rd Avenue. In 2011, Short Elliott Hendrickson, Inc. was retained by the City of Mankato to develop a master plan for the Germania Park area. This plan originally envisioned the improvements starting in 2015. Due to funding priorities within the Community Investment Plan these projects were delayed until 2019. The roads proposed for improvement in 2022 include: 6th Avenue from Harper Street to Cleveland Street; 5th Avenue from Harper Street to Cleveland Street; 4th Avenue from Harper Street to Lind Street; and Lind Street from 6th Avenue to 3rd Avenue. January - Feasibility February - Hearing March - Bid May - Construction October - Project completion As January 20, 2023, this project is currently in the FY 2023 - 2027 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents