Similar Projects
Ground Thawing Services
Term Contract
Post-Bid
Less than $175,000 est. value
Minneapolis, MN

Ductile Iron Pipe
Term Contract
Post-Bid
Minneapolis, MN

Meter Station M228A, Interceptor 7015C, and L35 Repair
Renovation, Addition
Results
Brooklyn Park, Maple Grove, MN 55101

Ridgedale Drive Watermain Replacement
Results
Minnetonka, MN 55305

Grandview South Area Street and Utility Improvements Improvement
Post-Bid
$9,000,000 to $10,000,000 est. value
Brooklyn Center, MN

Brookdale Park Neighborhood Reconstruction
Results
Less than $5,900,000 est. value
Brooklyn Park, MN 55444

Energy Hills, Woodland Ponds, Wintergreen Area Street Reconstruction
Post-Bid
Maple Grove, MN

2021 Street Reconstruction Project Grading, Base, Bituminous Surfacing, Concrete Curb and Gutter, Storm Sewer and Water Main
Results
Less than $4,600,000 est. value
Plymouth, MN

77th Street and TH 77 Improvements
Infrastructure
Post-Bid
Richfield, MN

Phase 4 Street and Utility
Results
Minneapolis, MN

Opus Area Improvements Phase 2
Results
Minnetonka, MN

2021 Water Rehabilitation
Results
Less than $1,000,000 est. value
Brooklyn Park, MN

2021 Infrastructure Improvements
Results
$1,500,000 to $2,000,000 est. value
MN

Groveland Bay Improvements
Results
Minneapolis, MN

2021 Dean Avenue Improvement
Results
$880,000 est. value
Champlin, MN 55316

Reported 09/21/2021 12:00 AM
Project Title

Cellular AMI Water Meter Systems

Physical Address View project details and contacts
City, State (County) Minnetonka, MN   (Hennepin County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of but is not limited to: 1. The supply of up to 17,500 residential water meters varying in size from 5/8" to 2". 2. The supply of an equivalent number of meter encoders and end-points. 3. The supply and integration of a head-end system. 4. Inclusion of a web-based customer portal for water-user interaction. 5. Monthly communication service for each water meter. 6. Gaskets, hardware, and any other supplies necessary to install each meter in its previously set location

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents