Similar Projects
Bridge Rehabilitation US-281
Renovation, Infrastructure
Bidding
$24,400,508 est. value
Hinton, OK 73047

Build a Low Water Bridge on Cummings Avenue
New Construction, Infrastructure
Bidding
$273,000 est. value
Pocola, OK 74902

Gateway Bridge Bid Package #4
New Construction
Post-Bid
Tulsa, OK 74127

Interchange Modification, Pavement Widening, and Bridge Turner Turnpike/i-44/Sh-66
New Construction, Infrastructure
Post-Bid

Grade, Drain, Surface, and Bridge
Results
Norman, OK 73019

Bridge and Approaches
Results
Elgin, OK

Construction of New Bridge 2213 Located at CR N2530 and E0260 South for District 2
New Construction, Infrastructure
Bidding
$500,000 est. value
OK

BNSF OKC River Connection
New Construction, Alteration
Post-Bid
Oklahoma City, OK

Bridge and Approaches
Results
Bluejacket, OK

Bridge Water Proof Seal US-60/US-183/US-270 Eastbound/SH-11/SH-5
Renovation, Infrastructure
Bidding
$50,000 est. value
Buffalo, Woodward, OK

Bridge 93A Over East Cattle Creek
Infrastructure
Post-Bid
Newkirk, OK

Bridge and Approaches
Results
Sulphur, OK

Bridge and Approaches County Road (Hulsey Prairie Road)
New Construction, Infrastructure
Bidding
$1,552,450 est. value
Wilburton, OK 74578

Bridge 93A Construction
New Construction, Infrastructure
Post-Bid
$473,000 est. value
Ponca City, OK

Bridge Water Proof Seal
Results

Last Updated 06/08/2022 05:01 AM
Project Title

Bridge and Approaches - I-40

Physical Address View project details and contacts
City, State (County) Clinton, OK 73601   (Custer County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,185,724
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a bridge / tunnel in Clinton, Oklahoma. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel. Bridge and Approaches I-40 South Frontage Road: Over Dry Creek, 5.8 Miles Northeast of the Washita County Line Near Clinton. Project Length = 0.066 Mile Counties: Custer Calendar Days: 120 Submit Any Questions or Concerns to the Office Engineer Division via: - Email: Odot-prebid.question@odot.org - Phone: (405) 521 - 2625 Each Bid Shall Be Accompanied by a Certified or Cashier's Check or Bid Bond Equal to 5% of the Bid Made Payable to the State of Oklahoma, Department of Transportation, as a Proposal Guaranty. Proposal Checks Will Be Held or Returned by the Department as Per Subsection 103.04 of the State Standard Specifications. ODOT- Call Order 445 - Bridge and Approaches - I-40

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents