Similar Projects
Fender Replacement at Lewes Delaware Ferry Terminal
Results
Lewes, DE 19958

Monopile Replacement at Lewes, Delaware Ferry Terminal
Results
Minquadale, DE 19720

Annual Vessel Maintenance and Dry-Docking
Results
New Castle, DE 19720

Dry-Docking, Repowering, and Repair M/V New Jersey
Results
New Castle, DE

Oyster House Park Phase I
Results
Seaford, DE 19973

USCG Station Indian River Inlet Pier Repairs
Results
Bethany Beach, Rehoboth Beach, DE 19930

Cape Henlopen – Pier Fishing Pile Repairs
Results
Lewes, DE 19958

Last Updated 12/11/2020 10:34 AM
Project Title

Wagamons Pond Boat Ramp Reconstruction

Physical Address View project details and contacts
City, State (County) Milton, DE 19968   (Sussex County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project will replace an existing concrete boat ramp, install a new aluminum fixed dock, replace a failing concrete bulkhead, install sidewalk, porta-john pad/enclosure and re-pave and re-stripe the parking lot.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 31 - Earthwork, Site Clearing, Earth Moving, Earthwork Methods, Shoring, Sheet Piling, Driven Piles, Timber Piles.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents