Similar Projects
Bristol-Main Mixed-Use Development
New Construction, Infrastructure
Conception
$35,000,000 CJ est. value
Sun Prairie, WI 53590

Madison - Deforest Const / Replace Pavement Nb / PVRPLA
Infrastructure
Conception
$3,000,000 CJ est. value
McFarland, WI 53558

Diventures / Sun Prairie
New Construction, Infrastructure - 10,500 SF
Design
$2,500,000 CJ est. value
Sun Prairie, WI 53590

Braxton Pl Resurfacing and La Mariposa Lane (New Street)
Infrastructure
Design
$900,000 CJ est. value
Madison, WI 53715

Walking Iron Wetland Restoration Walking Iron County Park - Rebid
Infrastructure
Bidding
$649,216 CJ est. value
Mazomanie, WI 53560

Cannonball Path Phase 6
Infrastructure
Bidding
$730,000 CJ est. value
Madison, WI 53715

O.b. Sherry Park – 3457/3461/3465 Milwaukee St. Demolition
Demolition, Infrastructure
Sub-Bidding
$90,000 CJ est. value
Madison, WI 53714

Spring Harbor Dredging 2022
Infrastructure
Sub-Bidding
$742,800 CJ est. value
Madison, WI 53715

Portillos
Alteration
Post-Bid
Madison, WI 53719

Hydrants
Infrastructure
Post-Bid
Madison, WI

Mold Abatement and Site Restoration Services
Term Contract
Results
Madison, WI

Village of Dane Southeast Public Works Loop
Results
Dane, WI

Air Compressor #3 Replacement - Walnut Street Heating Plant
Infrastructure
Construction
$87,597 CJ est. value
Madison, WI 53715

Arrowhead Pharmaceuticals Manufacturing Building / Verona
New Construction, Infrastructure - 164,000 SF
Construction
$250,000,000 CJ est. value
Verona, WI 53593

Windsor Crossing
New Construction, Infrastructure
Pending Verification
$14,000,000 CJ est. value
Deforest, WI 53532

Last Updated 08/16/2022 05:01 PM
Project Title

Water Main Rehabilitation

Physical Address View project details and contacts
City, State (County) Mount Horeb, WI 53572   (Dane County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $941,630 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

ESTIMATE OF PRINCIPAL ITEMS Water Main 2,690 LF Hydrants 9 EACH Water Service Connections 49 EACH Concrete Curb & Gutter 1,308 LF Bituminous Pavement 1,990 SY The Contract award shall be made based on the lowest responsive and responsible Bidder. All bidders must include a Statement of Bidders Qualifications with sealed Bids. Bidders who submit a bid must be a Plan Holder of record at the issuing office. Bids from Bidders not on the Plan Holders List may be returned as being not responsive. Each bid must be accompanied by a Bid Bond equal to at least 10% of the maximum bid as a guarantee that if the bid is accepted, the Contractor will, within 10 days of receipt of the Notice of Award, furnish the Owner with a Performance and Payment Bond equal to the Contract price. The project engineer contact is Heather Brose at SmithGroup, 44 East Mifflin, Suite 500, Madison, Wisconsin 53703, (608)327- 4443 or Heather.Brose@smithgroup.com. The Village of Mount Horeb reserves the right to reject any and all bids, to waive any technicality, and to accept any bid that it deems advantageous. All bids shall remain subject to acceptance for forty-five (45) days after the time set for bid opening.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents