Similar Projects
Pittsburgh Theological Seminary Phase 2 - 3 Interior Loop Road
New Construction
Conception
Pittsburgh, PA 15206

Holtwood Solar Project
New Construction
Conception
Holtwood, PA 17565

Lower Allen Commons
New Construction
Design
Lower Allen, PA 17011

Blue Bell Mobile Home Park
New Construction
Design
Ephrata, PA 17522

FY 2022 Annual Master Demolition Program
Demolition, Term Contract
Bidding
Philadelphia, PA

Safe Neighborhood Demolition - Tingley Avenue
Demolition
Bidding
$75,000 est. value
Bellevue, Pittsburgh, PA 15202

College Avenue and Heister Street Sidewalk and Utility Upgrades
Renovation
Post-Bid
$662,219 est. value
University Park, PA 16802

FY 2021 Annual Master Demolition Program
Demolition, Term Contract
Post-Bid
Philadelphia, PA 19102

Nesquehoning Hose Company No. 1 Site Improvements
Results
Nesquehoning, PA 18240

Phase 2 Site Improvements
Results
Cresson, PA 16630

Susquehanna Union Green - Sitework
New Construction - 496,148 SF
Construction
Harrisburg, PA 17110

Hazleton Bus Storage and Maintenance Facility Project
Construction
Hazleton, PA 18202

Circle M RV Campground and Resort
Renovation
Design
Lancaster, PA 17603

Demolition Project
Demolition
Bidding
Johnstown, PA

Eastvale Fire Hall Demolition - 2018 Year CDBG
Demolition
Post-Bid
Beaver, PA

Last Updated 12/15/2021 12:33 PM
Project Title

Taylor Farm Demolition Project

Physical Address View project details and contacts
City, State (County) Royersford, PA 19468   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Demolition, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes providing all labor, equipment, and materials to complete the demolition of the house structure, demolition of slabs, foundation walls, pads, walkways and vegetation, and private utility poles, removal of existing septic system, water well closure as well as the work associated with site restoration and stabilization activities, including temporary erosion and sedimentation controls. The work included with this project also includes furnishing, placement, and compaction of fill material to bring the site to grade, furnishing and placement of topsoil, final grading and seeding and mulching all disturbed areas. The work includes removal and proper disposal of demolition debris and rubble.The project will also include providing all labor, equipment and materials to complete asbestos abatement and lead-based paint abatement prior to the demolition of the structure.

Details

Division 02 - Existing Conditions, Subsurface Investigation, Demolition, Asbestos Remediation, Asbestos Abatement, Lead Remediation, Lead-Based Paint Remediation, Lead-Based Paint Abatement.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Planting Preparation, Soil Preparation, Mulching, Landscape Grading, Topsoil Placement and Grading, Turf and Grasses, Seeding.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents