Similar Projects
Demolition of Buildings 352, 354, and 358, and Underground Storage Tank Removal
Demolition
Bidding
Detroit, MI

Abatement and Demolition of Residential Structures - 10.29.18
Post-Bid
Detroit, MI

Demolition of One Property Jolly Road
Post-Bid
Livonia, MI

City of Detroit Demolition Services
Term Contract
Results
Detroit, MI

Western Wayne Skill Center (WWSC) Demo
Results
Less than $550,000 est. value
Livonia, MI

Demolition
Demolition
Post-Bid
Ecorse, MI

Abatement and Demolition of Residential Structures - 11.13.18C
Demolition
Results
Detroit, MI

Demolition
Demolition
Post-Bid
Ecorse, MI

Abatement and Demolition of Residential Structures - 11.13.18F
Demolition
Results
Detroit, MI

Perrinville Early Childhood Center Demolition
Demolition
Post-Bid
Livonia, MI

Abatement and Demolition of Residential Structures - 11.13.18B
Demolition
Results
Detroit, MI

CDBG Demolition of Structures
Demolition
Post-Bid
Lincoln Park, MI

Abatement and Demolition of Residential Structures - 11.13.18E
Demolition
Results
Detroit, MI

Abatement and Demolition of Residential Structures
Demolition
Post-Bid
Detroit, MI

Abatement and Demolition of Residential Structures - 11.13.18G
Demolition
Results
Detroit, MI

Last Updated 12/19/2018 04:48 PM
Project Title

Selective Demolition Contractor Services

Physical Address View project details and contacts
City, State (County) Detroit, MI   (Wayne County)
Category(s) Heavy and Highway
Sub-Category(s) Demolition
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Contract Duration - 1 year The contractor will furnish a proposal and price for all material and labor associated with the successful completion of Selective Demolition. The contractor must familiarize himself with the site, all details of the work required, and existing conditions. Beginning work constitutes acceptance of conditions A. General: Demolish and remove existing construction only to the extent required by approved scope of work. Use methods required to complete the Work within limitations of governing regulations and as follows: 1. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping, to minimize disturbance of adjacent surfaces. Temporarily cover openings to remain. 2. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain fire watch and portable fire suppression devices during flame-cutting operations 3. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site. 4. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing. 5. Air-Conditioning Equipment: Remove equipment without releasing refrigerants. 6. Dispose of demolished items and materials promptly
Details
Division 02 - Existing Conditions, Demolition.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents