Similar Projects
Z2DA--Replace Boilers and Controls, Phase II (VA-20-00028010)
Renovation
Design
$5,000,000 to $10,000,000 est. value
Grand Junction, CO 81501

Synopsis- Environmental Remediation Services & Construction for Rocky Mountain Arsenal
New Construction
Design
Commerce City, CO

SRWRF Digester 1 Coating and Repair
Bidding
Durango, CO 81301

Colorado Water Treatment Plant Backwash Pond Phase 1
New Construction
Bidding
Greenwood Village, CO

Water Chemical and Services
Post-Bid
CO

Water Treatment Plant Expansion Project
Post-Bid
Orchard, CO

Construction Manager for Wastewater Building Improvements
Results
Denver, CO

Water Treatment Facility Improvements Project
Results
Elizabeth, CO

Wtp Treatment Chemical
Post-Bid
Louisville, CO 80027

Fy2019 Wastewater Reclamation Facility West Overlay Project
Results
$250,000 to $300,000 est. value
Pueblo, CO 81003

Leadville Mine Drainage Tunnel Water Treatment
Post-Bid
$10,000,000 est. value
Leadville, CO

2019 Water Treatment Plant Office Addition
Addition
Results
Pueblo West, CO 81007

Chatfield Basin Water Reclamation Facility
Post-Bid
Greenwood Village, CO 80112

WWTP Blower Improvements
Results
Less than $300,000 est. value
Estes Park, CO 80511

Water Treatment Plant Maintenance Work
Post-Bid
Brighton, CO 80016

Last Updated 04/23/2021 10:46 AM
Project Title

Filter Interface Panel Replacement

Physical Address View project details and contacts
City, State (County) Englewood, CO   (Arapahoe County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The goal of the Project is to replace the existing outdated FIP with modern hardware and software. The current panel logic and systems automation have been reviewed among project stakeholders and functionality and control logic needs for new FIP have been established. All equipment and software shall be compatible with the current SCADA system, as well as future planned software upgrades and modernization efforts that are planned over the next several years. The City’s iFix Version 5.9 HMI software is being upgraded to Factory Talk View SE Version 10.0 or later as part of this project. The Project includes two major components of work: 1) Physical upgrades and repairs to the FIP panel and related wiring systems, and 2) Control system software upgrades and system programming.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents