Similar Projects
A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

RFQ Design - New Residence Hall VII
New Construction, Infrastructure
Bidding
$210,000,000 CJ est. value
Golden, CO 80401

RFQ Engineering - West Colfax Beautification Project: Streetscape Elements Conceptual Plan - Ward
Infrastructure
Bidding
$800,000 CJ est. value
Lakewood, CO 80215

Engineering, Planning and Development
Post-Bid

Engineering, Planning and Development
Post-Bid

Nationwide Architect and Engineering IDIQ - Small Business Pool
Results
Less than $10,000,000 est. value

Nationwide Architect and Engineering IDIQ - Small Business Pool
Results
Less than $10,000,000 est. value

Full Service Design IDIQ
New Construction
Design

RFP - Region 1 PS I-70 Bridges over Ward Road CM CI MT
Term Contract
Bidding
$2,300,000 CJ est. value
Arvada, CO 80004

Architect-Engineering (AE) Indefinite Delivery Contract (IDC) in Support of the Defense Health Agency (DHA) and Component Medical Commands
Post-Bid
Less than $45,000,000 est. value
Washington, DC

Highway and/or Bridge Design and Engineering Services
Results
Less than $80,000,000 est. value

Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

RFP - Housing Analysis and Strategic Housing Plan
Term Contract
Bidding
Lakewood, CO 80226

DFC Team East O&M - Source Sought/Procurement Notice
Post-Bid
Lakewood, CO

Last Updated 08/18/2022 12:16 PM
Project Title

RFQ Design - Replace East Wing Roof, Lakewood Campus, Phase 1 of 2

Physical Address View project details and contacts
City, State (County) Lakewood, CO 80228   (Jefferson County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids
Project Status Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $1,334,055 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

RFQ Design - Replace East Wing Roof, Lakewood Campus, Phase 1 of 2 The design work for this Design-Bid-Build project will be contracted directly with a Roof Consultant firm under the State of Colorado's Architect/Engineer Agreement SC5.1 (Rev 07/2022), along with the Terms and Conditions SC5.1TC (Rev 07/2022). The work will consist of design for BOTH Phases 1 AND 2. Each phase will be competitively bid and constructed separately (only Phase 1 has been funded to date), therefore two sets of construction bid documents will be required. Stamped drawings and specifications must be submitted to Owner's third-party code review consultant for review. Contract Administration scope of work under this Agreement will be for Phase 1 only. It is the Owner's intent to remove the existing 20-year-old ballasted EPDM roof, installing additional insulation to improve R value and installing a new 60 mil fully adhered EPDM or TPO membrane. The total roof square footage for both phases is approximately 90,000 sf; the Consultant will work with the Owner to determine the actual areas included in each phase. It is the Owner's wish that the amount of work in each phase be roughly equal. The final determination on the schedule will be made in conjunction with the selected Consultant, but there are unusual funding constraints on the project, including an abbreviated period of time to encumber all project funds, which must be met. Question Deadline 08/26/2022 at 5:00 PM MT Questions must be in writing to: renee.murillo@rrcc.edu and mark.bana@rrcc.edu The method of contractor selection has not been determined at this time.

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents