Similar Projects
SMD Services Installation of Vinyl Composition (V/C) Floor Tile in Apartments - Morrisania and Jackson Houses, Bronx
Alteration
Bidding
Bronx, NY

SMD Services Installation of Vinyl Composition (V/C) Floor Tile in Apartments - Parkside, Bronx
Alteration
Bidding
Bronx, NY

Mott Haven Apartments Vinyl Composition (V/C) Floor Tile Installation
Alteration
Post-Bid
Bronx, NY

Installation of V/C Floor Tile in Apts - Sotomayer Houses
Alteration
Post-Bid
Bronx, NY 10472

SMD Services Installation of Vinyl Composition (V/C) Floor Tile in Apartments at Morris I Houses and Morris II Houses
Alteration
Results
Bronx, NY 10456

Installation Of V/C Floor Tile In Apts
Alteration
Results
Bronx, NY 10473

SMD Services Installation of Vinyl Composition (V/C) Floor Tile in Apartments - Adams, Bronx
Alteration
Bidding
Bronx, NY

V/C Floor Tile Installation
Alteration
Post-Bid
Bronx, NY 10451

SMD Services Installation of V/C Floor Tile in Apts-Patterson Houses
Alteration
Results
Bronx, NY 10451

SMD Services Installation of Vinyl Composition (V/C) Floor Tile in Apartments - Webster Houses, Bronx
Alteration
Bidding
Bronx, NY

Installation of V/C Floor Tile In Apts - Gun Hill Houses
Alteration
Post-Bid
Bronx, NY 10467

Installation of V/C Floor Tile in Apartments Fort Independence
Term Contract
Results
Bronx, NY 10451

SMD Services Installation of Vinyl Composition (V/C) Floor Tile in Apartments - Sedgwick Houses, Bronx
Alteration
Bidding
Bronx, NY

Installation of V/C Floor Tile in Apts - Sotomayor Houses, 1471 Watson Avenue, Glebe Avenue-Westchester Avenue
Alteration
Post-Bid
Bronx, NY 10472

The Construction of Mezzanine Floor for Storage at Aramark Building
Term Contract
Results
Bronx, NY 10454

Reported 05/25/2022 12:00 AM
Project Title

SMD Services Installation of Vinyl Composition (V/C) Floor Tile in Apartments - Sotomayor Houses, Bronx

Physical Address View project details and contacts
City, State (County) Bronx, NY 10472   (Bronx County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of vinyl-composition floor tile over existing floor tile. Installation of vinyl-composition floor tile over the existing properly prepared concrete floor. The removal and replacement of existing/or missing vinyl cove base molding. As directed, remove Non-Asbestos Containing floor coverings, including but not limited to vinyl composition floor tile, linoleum, self-adhesive floor tile, carpet, ceramic floor tile, wood flooring, etc. The work as described above shall be performed in occupied and unoccupied ("move-out") apartments as designated by the Development Superintendent. The contractor will be required to perform this work in complete apartments or complete individual/rooms within apartments. However, the contractor will not be required to do a portion of a room. The work will be done in any apartment or in any individual room of any apartment in any of the various buildings of the Development(s) as listed in the Form of Proposal.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents