Similar Projects
UDOT Culvert Cleaning and Video Contract
Term Contract
Post-Bid

Elevated Culvert Cleaning, Inspecting and Lining
Post-Bid
Salt Lake City, UT 84044

Dry Creek Improvements
Results
Less than $1,000,000 est. value
Sandy, UT

Zone 3 North 3 MG Reservoir Project
Results
Less than $3,200,000 est. value
West Jordan, UT 84088

Fold and Form Pipe Liner
Term Contract
Post-Bid
Taylorsville, UT 84129

Precast Stormwater Box
Results
Less than $7,000 est. value
Riverton, UT

Traverse Ridge Storm Drain
Post-Bid
Draper, UT

Lone Peak Parkway - 12000 South Culvert Extension
Results
Less than $300,000 est. value
Draper, UT 84020

Segmented Pipe Liner
Term Contract
Post-Bid
UT

Road and Drainage Improvements - Central Avenue
Results
$300,000 to $400,000 est. value
Millcreek, UT 84107

10th East Senior Center Retaining Wall
Post-Bid
Salt Lake City, UT 84114

Anna Caroline Drive Bridge
Results
Less than $443,240 est. value
West Valley City, UT 84119

Hog Hollow Soil Repair
Post-Bid
Less than $175,000 est. value
Herriman, UT 84065

Sandy Canal Trail Design 9400 South to Lazon Drive
Results
Sandy, UT 84094

I-80; Culvert Rehabilitation
Post-Bid
$500,000 to $1,500,000 est. value

Last Updated 02/14/2020 12:05 PM
Project Title

2550 South 7200 West to 8000 West Surcharge and Culvert Package

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84190   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,800,000 to $3,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Extension of the existing 16’ x 6’ pre-cast concrete box culvert at 7200 West, relocating an existing concrete headwall, and extending existing storm drain pipe to new headwall location. Also includes managing upstream storage and storm water flows in the canal during the Phase 1 work and re-grading the Riter Canal at the new headwall location to tie new headwall to existing Riter Canal banks. This work to be completed during the Riter Canal shutdown period between March 15, 2020 and April 14, 2020 and shall be considered Phase 1 Work. This work is being bid as Bid Alternate 1. Due to lead times on precast materials, the intention is to issue a Phase 1 NTP as soon as practical after award of the contract.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents