Similar Projects
ID Bor Lake Cascades (1) Dam Crest Road Improvements
Term Contract
Design
Cascade, ID

SFSR Overlay and Chip Seal project on the Payette National Forest
Alteration
Design
$1,000,000 to $5,000,000 est. value
McCall, ID 83638

I 90 Cedars to Dudley Rd
Infrastructure
Bidding
$15,000,000 to $25,000,000 est. value
Coeur d'Alene, ID 83815

US-20, US-26, Chinden Blvd; I-84 to Middleton Rd
Infrastructure
Bidding
$25,000,000 est. value
Caldwell, ID

Construction Services for Cleanup of Upper Basin of the Bunker Hill Mining and Metallurgical Complex Superfund Site
Infrastructure, Alteration
Post-Bid
ID

I-86/I-15 Sys IC Reconstruction Pre Advertisement Presentation
Infrastructure
Post-Bid
ID

DIJ Construct Taxilane
Infrastructure, Alteration
Results
$1,255,580 est. value
Driggs, ID 83422

Runway 2/20 Pavement Maintenance at Sandpoint Airport
Infrastructure
Results
Sandpoint, ID 83864

Almon Asbury Alley Paving Project
Infrastructure
Bidding
$371,233 est. value
Moscow, ID 83843

Culdesac Canyon Passing Lane, PH 3
Infrastructure
Post-Bid
$10,000,000 to $15,000,000 est. value

Widening US-95 from MP 471.33 to 471.75 to add both southbound and northbound acceleration lanes
Infrastructure
Results
ID

NHC-6854, 45th West; 49th South to US-20
Infrastructure
Bidding
$2,500,000 to $5,000,000 est. value
Idaho Falls, ID 83402

For the Work of Performing Preventative Pavement Maintenance on All State Roads in Power County
Infrastructure
Post-Bid
$2,500,000 to $5,000,000 est. value
ID

Widening SH-3 and conducting levee repair between MP 91.86 and MP 89.26
Infrastructure
Results
ID

SH-53, Hauser Lake Rd to N Bruss Rd
Infrastructure
Bidding
$5,000,000 to $10,000,000 est. value
Rathdrum, ID 83858

Reported 05/28/2022 12:00 AM
Project Title

GAOA - SFSR Road Pavement Rehabilitation Payette National Forest

Physical Address View project details and contacts
City, State (County) North Fork, ID   (Lemhi County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of removing and patching asphalt edge cracking, removal of surface drains, placing a 2" asphalt overlay on approximately 7.5 miles of the roadway, and chip sealing approximately 9 miles of the roadway. Work includes but is not limited to: cutting and removing damaged asphalt on road edge, cutting removing and backfilling existing surface drains, replacing asphalt removed from edge damage and surface drains, placing tack and 2" thick overlay consisting of 1/2 " asphalt, and placing a 1/2 " Chipseal.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents