Similar Projects
2020 Sidewalk Trip Hazard Maintenance Program
Term Contract
Post-Bid
Less than $80,000 est. value
Bountiful, UT

Concrete Replacement Project
Post-Bid
Woods Cross, UT 84087

Removal and Construction of Concrete Curb and Sidewalk at Multiple Locations City
Results
Less than $100,000 est. value
West Bountiful, UT 84087

2020 Replacement and New Construction of Sidewalk, Curb and Gutter and Storm Drain Facilities at Random Locations
Results
$606,154 est. value
Bountiful, UT 84010

Sunset Drive Curb, Gutter and Sidewalk Phase 2
Post-Bid
Kaysville, UT 84037

SR-193 920 East to 1700 East Sidewalk
Results
Less than $125,000 est. value
Layton, UT 84041

Corporation Founders West Parking Lot Improvement Project
Post-Bid
Syracuse, UT 84075

DFCM Construction - UHP Farmington Bldg Parking Lot Expansion and Security Measures
Results
$212,000 est. value
Farmington, UT 84025

DFCM Construction - VBS Design/Build - WSU Noorda A2 Lot & Paid Parking Lot
Post-Bid
Less than $3,308,642 est. value

West Hill Field Road Sidewalk Improvements, Project
Results
Less than $90,000 est. value
Layton, UT 84041

Bonneville Shoreline Design and Construction
Post-Bid
UT

DFCM Construction - General Contractors-DWR EWEC Boardwalk and Hasenyager Trail
Results
$140,000 est. value
Farmington, UT 84025

New Neighborhood Park
Post-Bid
Less than $1,400,000 est. value
Layton, UT 84041

2020 City-Wide Concrete Repair Project
Results
Less than $265,053 est. value
Fruit Heights, UT 84037

Layton City New Neighborhood Park
Addition
Post-Bid
$1,400,000 est. value
Layton, UT 84041

Last Updated 01/22/2021 02:58 PM
Project Title

Layton Sidewalk Improvements

Physical Address View project details and contacts
City, State (County) Layton, UT 84040   (Davis County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the installation of sidewalk, curb and gutter, asphalt and all incidental work associated with this sidewalk installation. There are three separate work areas associated with this project: King Street, Angel Street and Layton Hills Parkway.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents