Similar Projects
Postvale Road, Grier Road Rehabilitation Phase 2 - ST095 - Town of Marana
Infrastructure
Conception
$260,000 est. value
Marana, AZ

Tangerine Road Widening, Phase 2A - ST098 - Town of Marana
Alteration
Conception
$27,000,000 est. value
Marana, AZ 85658

AutoZone #3618 / Tucson (Ajo)
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Tucson, AZ 85757

AutoZone #3618 / Tucson (Ajo)
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Tucson, AZ 85757

West Silverbell Road, Blanco Wash Bridge (4SRBWB)
New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Marana, AZ 85653

West Silverbell Road, Blanco Wash Bridge (4SRBWB)
New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Marana, AZ 85653

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Tucson - Benson Highway (I-10) (Ajo Way to MP 272)
Infrastructure
Results
$15,495,176 CJ est. value
Tucson, AZ 85706

Tucson - Benson Highway (I-10) (Ajo Way to MP 272)
Infrastructure
Results
$15,495,176 CJ est. value
Tucson, AZ 85706

Lohse Family YMCA Phase 2 - TI Package
Infrastructure, Renovation
Construction
$2,500,000 CJ est. value
Tucson, AZ 85701

Lohse Family YMCA Phase 2 - TI Package
Infrastructure, Renovation
Construction
$2,500,000 CJ est. value
Tucson, AZ 85701

22nd Street Manufacturing and Warehouse Building
New Construction, Infrastructure - 16,100 SF
Pending Verification
$2,000,000 CJ est. value
Tucson, AZ 85713

South Kolb Road Self-Storage
New Construction, Infrastructure - 14,511 SF
Pending Verification
$2,000,000 CJ est. value
Tucson, AZ 85756

First Avenue - River To Grant - SR11 - City Of Tucson
Infrastructure
Conception
$71,988,200 CJ est. value
Tucson, AZ 85719

Last Updated 09/04/2023 12:03 AM
Project Title

610 CACS Command and Control Facility - Davis-Monthan AFB

Physical Address View project details and contacts
City, State (County) Tucson, AZ 85708   (Pima County)
Category(s) Government/Public, Heavy and Highway, Sewer and Water
Sub-Category(s) Military Facility, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $8,533,358 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Award Date: Aug 31, 2023 Contract Award Number: W912QR21D0081 Task/Delivery Order Number: W912QR23F0353 Contractor Awarded Unique Entity ID: S816XZESSNB9 Contractor Awarded Name: Gideon Contracting, Limited Liability Company Contractor Awarded Address: San Antonio, TX 78203 USA Base and All Options Value (Total Contract Value): $8,533,358.00 Reference is made to your Indefinite Delivery Contracts, Numbers W912QR21D0079 - W912QR21D0084, Design Build and Design Bid Build, Firm Fixed Price Multiple Award Task Order Contracts (MATOCs) to support the military construction (MILCON) and operations and maintenance (O&M) funded construction requirements for the U.S. Army Reserves, U.S. Air Force Reserves, U.S. Air Force and U.S. Army programs in the Western Region. We request you submit a price proposal for construction of New Construction of 8050 SF Building consisting of floor slab, structural steel frame with split faced concrete masonry unit facade and a standing seam metal roof. The project includes all utilities, site improvements, pavements, detection /protection (PL-3) features, security/cybersecurity enhancements and other supporting work necessary to make a complete and useable facility. The facility must be able to withstand seismic effects as prescribed in applicable codes and design guides. Sustainable principles, to include life cycle cost effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facility Criteria 1-200-02. This includes preparation of a life-cycle cost analysis for energy consuming systems, renewable energy generating systems, whenever life cycle cost effective is selected as the reason any requirement of Unified Facility Criteria 1-200-02 is partially compliant or not applicable. This project will comply with Department of Defense antiterrorism/force protection requirements per Unified Facility Criteria 4-010-01 as detailed in the scope of work, drawings, and specifications posted at www.SAM.gov. The documents are available for download at www.SAM.gov only. All vendors must be registered in the SAM database at SAM.gov. The RFP can be found by logging into the website as a vendor and searching for the solicitation number W912QR-30479897. The cost range is between $5,000,000 and $10,000,000. PLEASE NOTE: THIS IS FOR CONSTRUCTION SERVICES ONLY. Question Deadline 07/02/2023 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. W912QR21D0079 thru 21D0084 All questions regarding this Request for Proposal (RFP) must be submitted via ProjNet. No Government responses will be entered into the ProjNet system within five (5) calendar days prior to the proposal due date stated in this letter. Offeror inquiry key for this specific project is: YVIB25-7WYPFF

Details

8,050 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents