Similar Projects
Safety D/B Push Button for WWD Devices at Interstate Ramps
Bidding

East Selmon Expressway Slip Ramps Design-Build
Bidding
Tampa, FL

Widen/Resurface Exist Lanes/Sidewalk/Bicycle Lanes
Post-Bid
Less than $1,378,994 est. value
FL

Harvest Center Sidewalk Improvements
Post-Bid
Homestead, FL

Sidewalk Restoration Services
Term Contract
Results
Miramar, FL

Six Mile Cypress Shared use Path from Winkler Avenue to Challenger Boulevard
Results
Less than $145,666 est. value
Fort Myers, FL 33901

Douglas Avenue Crosswalk
Bidding
Dunedin, FL 34698

Charlotte County Public Schools Punta Gorda Airport Phase 3A Parking
Post-Bid
Punta Gorda, FL

Parking Lot Resealing at Trails and Tails Park and Veterans Park
Results
Less than $22,000 est. value
Doral, FL 33178

Bypass Drive Improvements
Bidding
$1,500,000 est. value
Clearwater, FL 33764

Douglas Bldg. ADA Upgrades- Parking
Post-Bid
Tallahassee, FL 32399

Myrtle Street Improvements, Phase 3
Results
Less than $2,536,473 est. value
Sarasota, FL 34234

Street Resurfacing and Miscellaneous Roadway Improvements
Term Contract
Bidding
$650,000 est. value
Jupiter, FL

Public Private Partnership Redevelopment Opportunity for the Hollywood Beach Culture and Community Center
New Construction - 20,000 SF
Post-Bid
Hollywood, FL 33019

Oars and Paddles Park, Parking Lot Expansion
Results
Indian Harbour Beach, FL 32937

Last Updated 03/08/2021 04:22 AM
Project Title

CDBG Funded Sidewalk Construction Project for KOA Elementary School

Physical Address View project details and contacts
City, State (County) Kissimmee, FL 34758   (Osceola County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the construction of approximately 0.16 miles (852 feet) of 5-ft wide concrete sidewalk along the west side of Laurel Ave from KOA Street to Berkshire Road. The sidewalk will connect to existing sidewalk at both ends. The construction will include two mitered end section and a side drain pipe to accommodate the proposed sidewalk. The project will also include mobilization, clearing and grubbing, sodding and earthwork. All work is to be done within the existing right of way.

Details

Division 01 - General Requirements, Examination and Preparation, Mobilization.
Division 31 - Earthwork, Clearing and Grubbing, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Turf and Grasses, Sodding.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents