Similar Projects
Sierra Townhomes
New Construction - 187,018 SF
Design
$10,000,000 CJ est. value
West Fargo, ND 58078

Mechanical, Fire Sprinkler, Electrical at United Way Center for Opportunity
Renovation
Construction
Bismarck, ND 58501

2021 Exploratory Drilling AML
Term Contract
Post-Bid
$200,000 est. value

2021 Exploratory Drilling AML
Term Contract
Post-Bid
$200,000 est. value

2021 Exploratory Drilling AML
Term Contract
Post-Bid
$200,000 est. value

Burning Hearts Church Townhomes
New Construction - 21,122 SF
Design
$1,000,000 to $5,000,000 CJ est. value
West Fargo, ND 58078

Boulevard Square III - Phase 1
New Construction - 11,048 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Fargo, West Fargo, ND 58103

RRVWSP – MRIPS Wet Well and Site Development
Results
$3,000,000 to $4,000,000 est. value
Carrington, ND

Pinnacle Express Service Center
New Construction - 10,800 SF
Conception
$10,000,000 CJ est. value
Minot, ND 58701

Structure Demolition and Site Restoration
Demolition
Bidding
Minot, ND

507 Railroad Avenue Site Restoration
Bidding
$539,000 est. value
Ray, ND 58849

Yard Waste Drop Site Improvements
Bidding
$357,145 est. value
Grand Forks, ND

2021 Buechler/Velva Phase II AML
Post-Bid
$400,000 est. value
ND

Reported 03/17/2021 12:00 AM
Project Title

2021 Beulah/Zap Phase 16 AML

Physical Address View project details and contacts
City, State (County) Beulah, ND   (Mercer County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project entails approximately 10,000 feet of drilling and the injection of 3,000 cubic yards of grout and 2,000 tons of foamed sand into abandoned underground mines.to reclaim an abandoned mine land (AML) site by drilling into the mine workings and backfilling with cementitious grout and foamed sand to fill the void spaces. The AML site contains an abandoned underground lignite coal mine and is located near Beulah, North Dakota. The 2021 Beulah/Zap Phase 16 AML Project includes areas as shown on the map on page 49 and as further described: • ND Highway 200 right-of-way extending approximately ½ mile east and ¾ mile west of the intersection of Highway 200 and 60th Ave SW between Sections 12 and 13, T144N, R88W, and Sections 7 and 18, T144N, R87W. • North Dakota Game and Fish property located in Section 7, T144N, R87W. • The Curt Michaelson residence in the NE¼ of Section 12, T144N, R88W. • Other areas as directed by the Commission’s Project Manager.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents