Similar Projects
HVAC and Electrical Services
Term Contract
Post-Bid

20 Ton Indoor Handler Unit
Post-Bid
Columbia, SC

HVAC Maintenance and Repair Services
Term Contract
Results
Columbia, SC

Energy Savings Performance Services
Term Contract
Results
Columbia, Eastover, Hopkins, SC 29209

Make Up Air Unit
Post-Bid
Columbia, SC 29210

Tucker Center Chiller Replacement Project
Results
$700,000 to $922,000 est. value
Columbia, SC 29203

Sims/Aycock Building - Replace Control Valves
Post-Bid
$45,000 to $55,000 est. value
Columbia, SC 29201

J--Air Handler Filter Service
Results
Columbia, SC 29209

SC DMH Midlands Center Multizone HVAC Unit Replacement
Post-Bid
$200,000 to $240,000 est. value
Columbia, SC 29203

Monitoring and Controls of Two (2) Air Handling Units
Results
Columbia, SC 29201

Purchase of CTB Chiller and Compressor
Post-Bid
Columbia, SC 29202

McAdams Hall Duct Cleaning
Results
Less than $19,440 est. value
Columbia, SC

Roofing/HVAC Replacement - Richland Northeast High School
Post-Bid
Columbia, SC 29223

Outdoor Condensing Unit
Results
Less than $17,323 est. value
Columbia, SC

HVAC Maintenance and Repair Services
Term Contract
Post-Bid
Columbia, SC 29204

Last Updated 12/13/2019 01:40 PM
Project Title

USC School of Medicine Med Park 15 - Replace AHU-1 and 2

Physical Address View project details and contacts
City, State (County) Columbia, SC   (Richland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $120,000 to $140,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace AHU 1 and AHU 2 air handler units located in 15 mp basement. Replace chill water supply and return isolation valves on both units. install new DDC chill water control valves on both units. Abandon all pneumatic piping associated with old AHU's and demo back to specified location. Add controls to tie AHU's into METASYS building management system. Small and Minority business participation highly encouraged.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents