Similar Projects
Chemical Feed System at the Wastewater Treatment Facility
Renovation
Bidding
Angelica, WI

WWTF Valve Upgrades
Renovation
Bidding
Lake Nebagamon, WI

Rest Area 106 Wastewater Upgrade
Post-Bid
Dickeyville, WI 53808

Wastewater Treatment Facility Expansion
New Construction
Post-Bid
Kaukauna, WI 54130

Aeration System Upgrades
Results
South Wayne, WI 53587

Cornell WWTP Facility Improvements
Results
Cornell, WI 54732

Osmosis Plant at the Calumet County Park
New Construction
Bidding
Hilbert, WI 54129

2020 Waste Water Treatment Facility Sludge Dewatering System Improvements
Post-Bid
Less than $500,000 est. value
Portage, WI 53901

2020 WWTF Upgrade
Results
Less than $5,400,000 est. value
Palmyra, WI 53156

Water Treatment Services
Term Contract
Post-Bid
Black River Falls, WI 54615

Wastewater Treatment Facility Phase I Improvements
Results
Egg Harbor, WI 54209

Digester Cover Rehabilitation Project
Renovation
Post-Bid
Less than $300,000 est. value
Waupaca, WI

Barneveld WWTF Upgrades
Results
Barneveld, WI

Operations Building Elevator Modernization
Renovation
Post-Bid
$100,000 est. value
Madison, WI 53713

WWTF Chemical Phosphorus Removal Upgrade
Results
Brownsville, WI 53006

Reported 09/15/2021 12:00 AM
Project Title

WWTF Renovation

Physical Address View project details and contacts
City, State (County) Hatley, WI 54440   (Marathon County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of the remodeling of and the existing Village of Hatley Waste Water Building. • replacement of sliding metal panel doors with new rolling service doors; • replacement of existing exterior doors and new FRP Doors • replacement of existing metal roof panels and with a new a standing seam metal roof. • replacement of existing rigid roof insulation; • replace ment of existing 2x4 wood purlins; • new prefinished wall/eave vent; • new wall and ceiling insulation system; • new translucent panel windows • new FRP wall

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents