Similar Projects
Reconstruction of Royal Oaks Lift Station
Post-Bid
Pearland, TX

Miller Ranch Road Regional Lift Station Rehabilitation
New Construction
Post-Bid
Pearland, TX 77584

Cullen Regional Lift Station Rehabilitation
Results
Less than $768,600 est. value
Pearland, TX

Riverwalk Lift Station Reconstruction
Results
Less than $408,700 est. value
Pearland, TX 77581

Lift Station No. 2 and Force Main
Infrastructure
Post-Bid
TX

Lift Station 1 and 4 Improvements
Results
Less than $161,000 est. value
TX

Rehabilitation Of Duncan Drive Lift Station
Renovation
Results
$180,000 est. value
Oyster Creek, TX

Lift Station No. 3 Modifications
Renovation
Results
Houston, TX

HPW - Lift Station Renewal And Replacement
New Construction, Renovation
Results
$9,921,000 est. value
Houston, TX

Alvin ISD High School Lift Station
New Construction
Results
Alvin, TX

Lift Station No. 2
New Construction
Results
TX

Lift Station No.5
New Construction
Results
$706,000 est. value
Houston, TX

Stringfellow Unit - Lift Station Replacement
New Construction
Results
Rosharon, TX 77583

Shadow Creek Regional Lift Station Rehabilitation and Generator
Alteration
Results
$946,990 est. value
Pearland, TX 77584

Lift Station No. 1 and Offsite Utilities
New Construction
Results

Last Updated 05/23/2022 01:21 AM
Project Title

Harkey Road Lift Station to Serve Massey Oaks

Physical Address View project details and contacts
City, State (County) TX   (Brazoria County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The major items of work are as follows: a. Site preparation including clearing, grading and drainage. b. 12-foot diameter cast-in-place wet well. c. Three submersible wastewater pumps with piping, valves and hatches. d. Electrical. e. Site paving and fencing. f. Temporary access drive. The project site is located on the east side of Harkey Road approximately 2,600 feet south of County Road 100 w/in Brazoria County, Texas.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents