Similar Projects
Classroom Climate / Three Rivers Elementary - 2022 Bond - Bend-La Pine Schools
Renovation
Conception
$525,347 CJ est. value
Sunriver, OR 97707

Classroom Climate / La Pine Elementary - 2022 Bond - Bend-La Pine Schools
Renovation
Conception
$406,962 CJ est. value
La Pine, OR 97739

Lookout Point Powerhouse Heat Pump Ventilation
Alteration
Design
$250,000 to $500,000 est. value
Lowell, OR 97452

Replace Rooftop AHU USDA-ARS-PWA Corvallis
Renovation
Bidding
$5,000,000 CJ est. value
Corvallis, OR 97330

Rex Putnam High School Chiller Replacement
Renovation
Sub-Bidding
$635,000 CJ est. value
Milwaukie, OR 97267

EOU Head Start HVAC Upgrades
Renovation
Sub-Bidding
$194,092 CJ est. value
La Grande, OR 97850

J041--Mitsubishi & York Chiller Repairs
Term Contract
Post-Bid
White City, OR 97503

Wood Stove Exchange
Alteration
Post-Bid
Hillsboro, OR

OR-Malheur NWR-HVAC
Term Contract
Results
Portland, Princeton, OR 97721

OR-Malheur NWR-HVAC
Term Contract
Results
Portland, Princeton, OR 97721

Classroom Climate / High Lakes Elementary - 2022 Bond - Bend-La Pine Schools
Renovation
Pending Verification
$20,189 CJ est. value
Bend, OR 97701

Classroom Climate/WE Miller Elementary- 2022 Bond - Bend-La Pine Schools
Renovation
Pending Verification
$367,666 CJ est. value
Bend, OR 97703

Classroom Climate / Rosland Elementary - 2022 Bond - Bend-La Pine Schools
Renovation
Conception
$287,450 CJ est. value
La Pine, OR 97739

Astoria District 1 Office HVAC Replacement
Renovation
Sub-Bidding
$160,000 CJ est. value
Astoria, OR 97103

ODF HVAC Direct Digital Control System Upgrade Project: Salem Campus & Tillamook Forest Center
Renovation
Post-Bid
$856,535 CJ est. value
Salem, OR 97301

Last Updated 09/19/2023 11:32 PM
Project Title

Eoycf Walk-in Chiller & Freezer Replacement

Physical Address View project details and contacts
City, State (County) Tillamook, OR 97141   (Tillamook County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The following range is a Project estimate for bonding purposes: $150,000.00 to $300,000.00 This contract is for a public improvement subject to ors 279c.800 through 279c.870. Sole point of contact (spc) for this solicitation is jordan sim, senior construction contract specialist, at jordan.R.Sim@das.Oregon.Gov or by phone, 971-375-5154. The existing walk-in unit (to be demolished) is interior to the building with roof mounted condensers, and consists of a singular chiller section and a singular freezer section which are both separately controlled. The new walk-in unit configuration will consist of (2) separate chiller & freezer units, each separately controlled capable of running independently. Due to the remote location of the facility redundancy of such units is required. During construction, the facility kitchen will be fully operational. Due to the walk-ins being internal to the building and adjacent to the kitchen, and that this is a correctional facility, temporary separation walls are required to be constructed dividing the kitchen and work area. Access to the project area will be through a temporary opening at the exterior wall (facing the facility parking area). This will provide the contractor free access for construction (no security process) without disturbing the kitchen functionality. See project drawings for details regarding temporary access and separation walls. The contractor is required to provide a 200 s.f. minimum temporary refrigeration for both the chiller & freezer for the duration of the project. See project drawings for optional locations and temporary electrical connection direction The work performed under this Contract includes all labor, materials, transportation, equipment, permits, and services for and incidental to the completion of all construction Work in connection with the Project described in the Contract Documents, including, but not limited to, Attachment A - Specifications and Attachment B - Drawings. GENERAL PROJECT DESCRIPTION The scope of the Project includes, but may not be limited to, the following: 1. Demolition of existing walk-in unit. 2. Configure and install new walk-in unit including two (2) separate chiller & freezer units. 3. Contractor provided temporary refrigeration for both the chiller and freezer during project. Any questions or issues that may arise regarding the ITB, forms, Specifications, Plans, bidding process, change, clarification, the award process, protests and any other issues must be directed to the Purchaser/SPC: Jordan Sim Jordan.R.Sim@das.oregon.gov 1225 Ferry St SE Salem OR 97301 971-375-5154

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents