Similar Projects
White Mountain Apache Tribe Water Settlement - U0164 - City Of Avondale
Alteration
Conception
$2,800,000 est. value
Whiteriver, AZ 85941

Jr's Shop Addition
Addition, Demolition, Renovation, Infrastructure - 1,400 SF
Design
$280,000 CJ est. value
Joseph City, AZ 86032

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Reconstruction of Hir 501, 0.89 Miles of Residential Roadway on the Hopi Reservation
Infrastructure
Bidding
$400,000 CJ est. value
Indian Wells, AZ 86031

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

2021 Street Maintenance
Infrastructure
Post-Bid
Winslow, AZ 86047

Snowflake Sewer Line and Street Improvements
Results
Snowflake, AZ

Annual Contract for Hot Asphaltic Concrete Pavement Overlay
Term Contract
Results
Holbrook, AZ

Hashknife Solar Energy Center
Infrastructure
Pending Verification
$100,000,000 CJ est. value
Holbrook, AZ 86025

Frontier Park Playgound and Splash Pad - City of Show Low
New Construction, Infrastructure
Pending Verification
$1,200,000 CJ est. value
Show Low, AZ 85901

Airport Hangar Infrastructure City of Show Low
New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Show Low, AZ 85901

Asphalt Repair and Re-Pavement Materials and Services
Term Contract
Post-Bid
Buckeye, Douglas, Florence, Globe, Goodyear, Phoenix, Safford, Saint Johns, Somerton, Tucson, Winslow, AZ 85607

System Enhancement (Safety Improvements)
Infrastructure
Results

Big Dog at White Mountain Lake Storage
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Show Low, AZ 85901

Hopi Health Care Center - Emergency & Outpatient
Demolition, Infrastructure
Bidding
$1,300,000 CJ est. value
First Mesa, AZ 86042

Last Updated 12/19/2022 11:34 AM
Project Title

Flagstaff - Holbrook Highway (I-40) (Joe City - Perkins Valley)

Physical Address View project details and contacts
City, State (County) Joseph City, AZ 86025   (Navajo County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $10,731,525 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Tracs no 040 NA 277 F038401C Project no 040-D(244)T Termini Flagstaff - Holbrook Highway (I-40) Location Joseph City - Perkins Valley Route No. Milepost District Item No. I-40 277.40 to 282.80 Northeast 101685 The Amount Programmed for This Contract is $16,250,000. The Location and Description of the Proposed Work Are as Follows: The proposed project is located in Navajo County on Interstate 40 between mileposts 277.40 and 282.80, near Holbrook. The work consists of removing the existing asphaltic concrete surface course by milling and replacing it with new asphaltic concrete. The work also includes replacing guardrail and guardrail end terminals, sealing bridge deck with methacrylate treatment, replacing pavement markings, and other related work. The time allowed for the completion of the work included in this contract will be 185 working days. The minimum contract-specified goal for participation by Disadvantaged Business Enterprises in the work, as a percentage of the total amount bid, shall be 4.52. To submit a valid bid, the bidder must (1) have prequalification from the Department as necessary for the project, and (2) be included on the project Plansholder List as a Prime. The Application for Contractor Prequalification may be obtained from the Contracts and Specifications website. A proposal guaranty in the form of either a certified or a cashier's check made payable to the State Treasurer of Arizona for not less than 10 percent of the amount of the bid or in the form of a surety (bid) bond for 10 percent of the amount of the bid shall accompany the proposal. Surety (bid) bonds will be accepted only on the form provided by the Department and only from corporate sureties authorized to do business in Arizona. AZDOT - Flagstaff - Holbrook Highway (I-40) (Joe City - Perkins Valley)

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents