Similar Projects
North Broadway improvements- Gladstone to NE Barry Road - City of Kansas City
Infrastructure
Conception
$394,000 CJ est. value
Kansas City, MO 64155

North Broadway improvements- Gladstone to NE Barry Road - City of Kansas City
Infrastructure
Conception
$394,000 CJ est. value
Kansas City, MO 64155

KC Tech Academy School Building / Liberty
New Construction, Infrastructure - 17,480 SF
Design
$9,000,000 CJ est. value
Liberty, MO 64068

Holiday Inn Express - Summit Street / Kansas City
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Kansas City, MO 64118

2023 Concrete Flatwork Replacement
Infrastructure
Bidding
$800,000 CJ est. value
Liberty, MO 64068

2023 Concrete Flatwork Replacement
Infrastructure
Bidding
$800,000 CJ est. value
Liberty, MO 64068

Forest Hill Village
Addition, New Construction, Renovation, Infrastructure - 22,721 SF
Sub-Bidding
$8,300,000 CJ est. value
Kansas City, MO 64116

Chapel Hill Elementary Addition and Renovation Project
Renovation, Addition
Post-Bid
Gladstone, MO 64119

Deferred Maintenance Projects - Phase 1.C
Renovation
Post-Bid
North Kansas City, MO

Intersection Improvements
Results
Gladstone, MO 64119

2021 Mill and Overlay Program
Results
Gladstone, MO

Briarcliff Elementary
Renovation, Addition - 10,300 SF
Construction
Kansas City, MO 64116

Ford Motor Company Stamping Plant / Liberty
Addition, Demolition, Infrastructure - 55,000 SF
Construction
$6,424,320 CJ est. value
Liberty, MO 64068

Liberty Self-Storage
New Construction, Infrastructure
Pending Verification
$14,000,000 CJ est. value
Liberty, MO 64068

Kinsley Forest Apartments - Phase 2
New Construction, Infrastructure
Pending Verification
$132,000,000 CJ est. value
Kansas City, MO 64118

Last Updated 01/27/2023 09:43 AM
Project Title

Crestview Elementary School - Remaining Trades Package

Physical Address View project details and contacts
City, State (County) Kansas City, MO 64116   (Clay County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $25,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of an elementary school. All scopes that were not part of package 1 are currently bidding. Direct all inquiries to the construction manager. Questions are due 1-20-2023, 4:00 PM The CM manual has been issued as of 1-9-2023. Addendum #1-#2 have been issued as of 1-24-2023. Note from CM dated 1-24-2023: Addendum 2 Today I've received several emails about this so just wanted to send out a quick message to everyone that we still plan to issue Addendum 2 by COB today. This will include answers to all RFI's that were before the deadline (included those that weren't answered in Addendum 1). We're also trying to answer the ones that came in late but may run out of time on some.. I'll send out another message later when Addendum 2 is available. Thanks, Nate

Details

2 Stories Above Grade, 71,425 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents