Similar Projects
Needle Point Bipolar Ionizers
Post-Bid
Charlotte, NC

80 Ton Chiller
Post-Bid
Charlotte, NC

Grady Cole-Electrical Modifications and HVAC Replacement Project
Results
Charlotte, NC

Gantt Center and Bechtler Museum Humidifier Upgrades
Results
Less than $500,000 est. value
Charlotte, NC 28202

McEniry HVAC and IT Infrastructure Upgrades
Construction
$10,000,000 est. value
Charlotte, NC 28223

UNCC HVAC, Plumbing and Electrical Repairs - McEnir
Alteration
Post-Bid
Charlotte, NC

Charlotte-Mecklenburg Government Center HVAC Replacement
Results
$20,400,000 est. value
Charlotte, NC 28202

DDC Pneumatic Uplifts and Commissioning Phase I
Alteration
Post-Bid
Charlotte, Matthews, NC 28215

Lee S. Dukes WTP HVAC Replacement
Results
Charlotte, NC

Installation of Needlepoint Bipolar Ionization Units Phase III 37 CMS Sites
Alteration
Post-Bid
Charlotte, NC 28208

Replacement of Seven (7) Roof Top Air-Conditioning Units at JV Washam Elementary School
Results
$773,508 est. value
Cornelius, NC 28031

Replace 7 Rtu`S At J.V. Washam Elementary School
Alteration
Post-Bid
Cornelius, NC 28031

E-Concourse Air Handling Unit #64 Replacement
Results
Charlotte, NC

Replace 13 Unit Ventilators, 2 Split Systems, and Existing Pneumatic Control Systems With Full Direct Digital Controls at South Charlotte Middle School
Alteration
Post-Bid
Charlotte, NC 28277

Needlepoint Bipolar Ionization
Results
Charlotte, NC

Reported 02/09/2022 12:00 AM
Project Title

Replace Exhaust Fans at 6 Schools

Physical Address View project details and contacts
City, State (County) Charlotte, NC 28205   (Mecklenburg County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Goals Details See Document Page No: 23 Replacement of Exhaust Fans at 6 (six) Schools- Chantilly Montessori School, East Mecklenburg High School, Providence High School, Sedgefield High School, Southwest Middle School, Spaugh Middle School. Provide all engineering drawings, permits, documents and fees required by CMS and the Authority Having Jurisdiction (AHJ) for the completion of this project 1. Miscellaneous trade permits and fees. 2. Contractor is responsible for meeting the attached insurance requirements. 3. Contractor License Number must be on Bid. 4. Permit Numbers must be on Invoices. 5. Field verify unit specifications and accessibility for replacement. 6. Please provide “Before” and “After” pictures of old units and new unit in place. Send with invoice copy. Pick three representative photos. 1. Demo and remove all existing units from site. 2. Equipment Submittals and warranty information must be provided with bid documents. 3. Contractor will be responsible for removing and reinstalling any wiring, (power and control). Label each unit as to electrical panel number and breaker number. 4. Place and install units to factory specifications and recommendations. 5. Provide all labor, materials, and equipment necessary for the completion of this project. Clean up work area when complete. 6. Report any concerns to CMS personnel.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents