Similar Projects
Tennis Court Improvements
Infrastructure
Design
$161,401 CJ est. value
Salem, AR 72576

Road Runner #1043 Renovation
Addition, Renovation, Infrastructure
Design
$800,000 CJ est. value
Bryant, AR 72022

Highway 5 Utility Relocation Military Road to Alcoa Road
Infrastructure
Bidding
$200,000 CJ est. value
Benton, AR 72019

Highway 5 Utility Relocation Military Road to Alcoa Road
Infrastructure
Bidding
$200,000 CJ est. value
Benton, AR 72019

Highway 9 Water Line Relocation
Results
Salem, AR

Installation of 230 5/8"X3/4" Meters and 10 - 1" Meters
Infrastructure
Results
Bauxite, AR

Lombard Heights
New Construction, Infrastructure
Pending Verification
$48,000,000 CJ est. value
Bryant, AR 72022

Abby Road Shopping Center
New Construction, Infrastructure - 7,500 SF
Design
$2,000,000 CJ est. value
Bryant, AR 72022

Raintree Acres Drainage Project - 1
Infrastructure
Bidding
$450,000 CJ est. value
Bryant, AR 72022

Benton Utilities - Exit 114 Waterline
Infrastructure
Results
Benton, AR

City of Haskell 2022 Water Line Improvements Project
Infrastructure
Bidding
$400,000 CJ est. value
Haskell, AR 72015

Northlake Road Drainage Improvements
Infrastructure
Bidding
$1,000,000 CJ est. value
Bryant, AR 72002

Benton Smithers Drive Sidewalk (TAP-20) (S)
Infrastructure
Bidding
$190,000 CJ est. value
Benton, AR 72015

Asphalt Paving Various Roads in Saline County
Infrastructure
Bidding
$200,000 CJ est. value
Benton, AR 72015

Districts 1, 5 and 10 Raised Pavement Markers (2023) (S)
Infrastructure
Bidding
$700,000 CJ est. value
East End, AR 72065

Last Updated 08/31/2022 10:09 AM
Project Title

Sewer System Rehabilitation - Basins 3, 5, 6 and 7

Physical Address View project details and contacts
City, State (County) Bryant, AR 72022   (Saline County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $221,735 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work included in this Contract consists of the furnishing of all tools, labor, equipment, materials, and supplies necessary to fully construct to the satisfaction of the Owner the Sewer System Rehabilitation - Basins 3, 5, 6, and 7 together with all incidental and ancillary work as shown on the Drawings. Installation is to be complete and inclusive of materials, equipment, concrete, pipe, valves, sluice gates, fittings, excavation, trenching, bedding material, backfill material, manholes, connection to existing lines(s), acceptance testing and quality control, traffic control, trench safety, and restoration of streets and property. B. Whenever in these Documents the word "Owner" appears, it shall be understood to mean the City of Bryant, Arkansas. C. Work or material not specifically mentioned in the Specifications, but designated on the Drawings, or forming an essential part of the Work mentioned or designated, shall be furnished and installed by the Contractor as though specifically mentioned. D. Construction of the work shall be by one General Contractor, utilizing Subcontractors for those specialties and portions of the Work that the General Contractor chooses to subcontract. All Subcontractors are subject to approval by the Owner in accordance with applicable sections of the General Conditions to these Specifications. The General Contractor shall maintain a responsible representative on-site whenever his subcontractors are on-site and engaged in the Work. E. The Drawings show the proposed location and details of construction work in this Contract. All work shall be performed by the Contractor in a thorough and workmanlike manner, in full accordance with the Drawings and Specifications by skilled and competent workmen well experienced in such construction methods and techniques. F. Any reference in these Specifications to an engineering standard (such as ASTM or AWWA) shall be to the latest version or edition as of the Bid Date. G. The Contractor shall not be permitted to sublet, sell or assign this contract or sublet any of the work to be performed hereunder without the written consent of the Owner and any such assignment or subletting of any such work without said consent shall be null and void and without force and effect. The Owner shall have the right to assign in whole or in part its rights hereunder. The project consists generally of certain sewer system rehabilitation including: 1. 391 feet of 8" sewer line replacement by open-cut methods; 2. 916 feet of 10" to 12" sewer line rehabilitation by pipe bursting; 3. 342 feet of 8" sewer line rehabilitation by pipe bursting; 4. Together with incidental and ancillary work. The Owner reserves the right to waive any informalities in the bidding and to reject any or all bids. Each Bidder must deposit with his bid, security in the amount, form, and subject to the conditions provided in the Information for Bidders appearing in the Contract Documents. No bidder may withdraw his bid within 60 calendar days after the actual date of the opening thereof. All Bidders must be licensed in accordance with the requirements of the Arkansas Contractors Licensing Board in accordance with Act 150 of 1965, as amended. All Bidders shall be qualified in all respects to do business in the State of Arkansas. This publication was paid for by the City of Bryant Public Works of Bryant, Arkansas. The amount to be paid for this publication is $335.98. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents