Similar Projects
Paving and Appurtenances to Serve Sienna Section 36
Infrastructure
Bidding
Katy, TX

FWRA Street Reconstruction Phase 2
Infrastructure
Bidding
$7,000,000 to $8,000,000 est. value
Houston, TX 77282

Gene Torres NTMP
Post-Bid
$200,000 to $300,000 est. value
El Paso, TX

Grading of Roads and Shaping of Ditches and Roadway - 367
Post-Bid
Hillsboro, TX 76645

Street Improvement Project Phase 2
Results
Highland Village, TX

Hillside Cemetery Road Improvements
Results
Less than $359,214 est. value
Cuero, TX 77954

US0290 - Crack Seal
Infrastructure
Bidding
$144,153 est. value
TX

Castle Hills Tract K Phase 2 Commercial Development Earthwork, Utilities and Paving
Post-Bid
Lewisville, TX 75028

Residential Street Replacement Program
Term Contract
Results
$1,400,000 est. value
Carrollton, TX 75006

Water, Sanitary Sewer, Drainage, and Paving Improvements for Big Sky Estates Phase 2
Infrastructure
Bidding
TX

Asphalt Pavement Parking Lots
Post-Bid
Houston, TX 77000

Stonewall Street Alley Improvements
Results
$380,000 est. value
Garland, TX 75043

Liberty Trails, Phase 3 - Paving Improvements
Post-Bid
TX 76100

2020 Asphalt Overlay Program
Results
$294,422 est. value
Richardson, TX 75080

Driftwood Club Core Phases 1 and 2 Paving, Drainage, Water, Wastewater, and Rainwater Collection System Improvements
Post-Bid
Driftwood, TX 78619

Last Updated 09/03/2021 10:56 AM
Project Title

FM 577- Intersection Improvement

Physical Address View project details and contacts
City, State (County) TX   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $404,788
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

104 6022 Removing Conc (Curb and Gutter) Lf 71.000 1 105 6016 Removing Stab Base & Asph Pav(16") Sy 360.000 2 110 6001 Excavation (Roadway) Cy 600.000 3 132 6006 Embankment (Final)(Dens Cont)(Ty C) Cy 170.000 4 160 6003 Furnishing and Placing Topsoil (4") Sy 1,315.000 5 162 6002 Block Sodding Sy 1,315.000 6 168 6001 Vegetative Watering Mg 13.200 7 169 6006 Soil Retention Blankets (Cl 2) (Ty F) Sy 45.000 8 247 6388 Fl Bs (Cmp in Plc)(Ty a Gr 5)(6") Sy 60.000 9 260 6002 Lime (Hydrated Lime (Slurry)) Ton 13.800 10 260 6027 Lime Trt (Exst Matl)(8") Sy 89.000 11 260 6073 Lime Trt (Subgrade)(8") Sy 960.000 12 276 6275 Cem Trt(Plnt Mx)(Cl L)(Ty a)(Gr 5)(6") Sy 89.000 13 276 6300 Cem Trt(Plnt Mx)(Cl M)(Tyd)(Gr1-2)(12") Sy 960.000 14 316 6026 Asph (Hfrs-2p) Gal 25.000 15 316 6029 Asph (Rc-250) Gal 211.000 16 316 6403 Aggr (Ty-b Gr-5 or Ty-l Gr-5) Cy 7.000 17 360 6001 Conc Pvmt (Cont Reinf - Crcp) (7") Sy 89.000 18 400 6006 Cut & Restoring Pav Sy 27.000 19 400 6009 Cement Stab Backfill (Inlet or Mh) Cy 29.000 20 402 6001 Trench Excavation Protection Lf 80.000 21 416 6030 Drill Shaft (Trf Sig Pole) (24 in) Lf 24.000 22 416 6032 Drill Shaft (Trf Sig Pole) (36 in) Lf 26.000 23 416 6034 Drill Shaft (Trf Sig Pole) (48 in) Lf 44.000 24 420 6011 Cl B Conc (Flume) Cy 2.000 25 464 6005 Rc Pipe (Cl Iii)(24 in) Lf 48.000 26 464 6007 Rc Pipe (Cl Iii)(30 in) Lf 80.000 27 465 6128 Inlet (Compl)(Psl)(Fg)(4ftx4ft-4ftx4ft) Ea 1.000 28 465 6197 Inlet (Compl)(Curb)(Ty 2)(5') Ea 2.000 29 479 6001 Adjusting Manholes Ea 1.000 30 479 6005 Adjusting Manholes (Water Valve Box) Ea 1.000 31 496 6002 Remov Str (Inlet) Ea 3.000 32 496 6007 Remov Str (Pipe) Lf 80.000 33 500 6001 Mobilization Ls 1.000 34 502 6001 Barricades, Signs and Traffic Handling Mo 4.000 35 506 6038 Temp Sedmt Cont Fence (Install) Lf 264.000 36 506 6039 Temp Sedmt Cont Fence (Remove) Lf 264.000 37 506 6041 Biodeg Erosn Cont Logs (Instl) (12") Lf 193.000 38 506 6043 Biodeg Erosn Cont Logs (Remove) Lf 193.000 39 529 6002 Conc Curb (Ty Ii) Lf 27.000 40 529 6008 Conc Curb & Gutter (Ty Ii) Lf 225.000 41 531 6002 Conc Sidewalks (5") Sy 40.000 42 531 6024 Curb Ramps (Ty 7) Sy 55.000 43 618 6023 Condt (Pvc) (Sch 40) (2") Lf 150.000 44 618 6024 Condt (Pvc) (Sch 40) (2") (Bore) Lf 280.000 45 618 6033 Condt (Pvc) (Sch 40) (4") Lf 90.000 46 618 6034 Condt (Pvc) (Sch 40) (4") (Bore) Lf 265.000 47 620 6006 Elec Condr (No.10) Insulated Lf 495.000 48 620 6008 Elec Condr (No.8) Insulated Lf 770.000 49 620 6012 Elec Condr (No.4) Insulated Lf 5.000 50 624 6010 Ground Box Ty D (162922)w/apron Ea 3.000 51 628 6145 Elc Srv Ty D 120/240 060(Ns)ss(E)sp(O) Ea 1.000 52 636 6001 Aluminum Signs (Ty a) Sf 90.000 53 644 6004 in Sm Rd Sn Sup&am Ty10bwg(1)sa(T) Ea 2.000 54 644 6033 in Sm Rd Sn Sup&am Tys80(1)sa(U) Ea 1.000 55 644 6068 Relocate Sm Rd Sn Sup&am Ty 10bwg Ea 2.000 56 644 6076 Remove Sm Rd Sn Sup&am Ea 1.000 57 662 6063 Wk Zn Pav Mrk Remov (W)4"(Sld) Lf 1,395.000 58 662 6075 Wk Zn Pav Mrk Remov (W)24"(Sld) Lf 36.000 59 662 6095 Wk Zn Pav Mrk Remov (Y)4"(Sld) Lf 2,650.000 60 666 6035 Refl Pav Mrk Ty I (W)8"(Sld)(090mil) Lf 345.000 61 666 6047 Refl Pav Mrk Ty I (W)24"(Sld)(090mil) Lf 365.000 62 666 6053 Refl Pav Mrk Ty I (W)(Arrow)(090mil) Ea 6.000 63 666 6056 Refl Pav Mrk Ty I(W)(Dbl Arrow)(090mil) Ea 3.000 64 666 6077 Refl Pav Mrk Ty I (W)(Word)(090mil) Ea 5.000 65 666 6302 Re Pm W/ret Req Ty I (W)4"(Sld)(090mil) Lf 310.000 66 666 6314 Re Pm W/ret Req Ty I (Y)4"(Sld)(090mil) Lf 635.000 67 672 6007 Refl Pav Mrkr Ty I-c Ea 24.000 68 672 6009 Refl Pav Mrkr Ty Ii-a-a Ea 38.000 69 677 6001 Elim Ext Pav Mrk & Mrks (4") Lf 480.000 70 677 6003 Elim Ext Pav Mrk & Mrks (8") Lf 70.000 71 677 6007 Elim Ext Pav Mrk & Mrks (24") Lf 90.000 72 677 6008 Elim Ext Pav Mrk & Mrks (Arrow) Ea 3.000 73 677 6009 Elim Ext Pav Mrk & Mrks (Dbl Arrow) Ea 2.000 74 677 6012 Elim Ext Pav Mrk & Mrks (Word) Ea 2.000 75 680 6003 Install Hwy Trf Sig (System) Ea 1.000 76 680 6004 Removing Traffic Signals Ea 1.000 77 682 6001 Veh Sig Sec (12")led(Grn) Ea 8.000 78 682 6002 Veh Sig Sec (12")led(Grn Arw) Ea 2.000 79 682 6003 Veh Sig Sec (12")led(Yel) Ea 8.000 80 682 6004 Veh Sig Sec (12")led(Yel Arw) Ea 4.000 81 682 6005 Veh Sig Sec (12")led(Red) Ea 8.000 82 682 6006 Veh Sig Sec (12")led(Red Arw) Ea 2.000 83 682 6051 Backplate W/refl Brdr(3 Sec)alum Ea 8.000 84 682 6052 Backplate W/refl Brdr(4 Sec)alum Ea 2.000 85 684 6031 Trf Sig Cbl (Ty a)(14 Awg)(5 Condr) Lf 940.000 86 684 6033 Trf Sig Cbl (Ty a)(14 Awg)(7 Condr) Lf 1,095.000 87 684 6049 Trf Sig Cbl (Ty a)(16 Awg)(3 Condr) Lf 420.000 88 686 6035 Ins Trf Sig Pl Am(S)1 Arm(32')lum Ea 1.000 89 686 6039 Ins Trf Sig Pl Am(S)1 Arm(36')lum Ea 1.000 90 686 6043 Ins Trf Sig Pl Am(S)1 Arm(40')lum Ea 1.000 91 686 6051 Ins Trf Sig Pl Am(S)1 Arm(48')lum Ea 1.000 92 687 6001 Ped Pole Assembly Ea 4.000 93 3077 6011 Sp Mixes Sp-c Pg64-22 Ton 7.000 94 3077 6022 Sp Mixes Sp-c Sac-a Pg70-22 Ton 139.000 95 3077 6041 Sp Mixes Sp-d Pg64-22 Ton 5.000 96 3084 6001 Bonding Course Gal 93.000 97 6001 6002 Portable Changeable Message Sign Ea 2.000 98 6058 6001 Bbu System (External Batt Cabinet) Ea 1.000 99 6185 6002 Tma (Stationary) Day 50.000 100 6185 6005 Tma (Mobile Operation) Day 5.000 101 6186 6002 Its Gnd Box(Pcast) Ty 1 (243636)w/aprn Ea 1.000 102 6306 6001 Vivds Prosr Sys Ea 1.000 103 6306 6003 Vivds Cam Assy Var Lns Ea 4.000 104 6306 6007 Vivds Cabling Lf 480.000 105

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents