Similar Projects
Combined Sewer Overflow 402-406 Wet Weather Improvements - City Of Cincinnati
Renovation
Conception
$14,018,000 est. value
Cincinnati, OH 45202

Bolton Plant Well #4 Replacement - City of Cincinnati
Infrastructure
Conception
$1,500,000 CJ est. value
Cincinnati, OH 45207

Campbell WWTP Grit Removal System
Renovation
Design
$1,600,000 CJ est. value
Campbell, OH 44405

The LORCO - Cinnamon Lake Maintenance Building project
Demolition, New Construction, Infrastructure
Design
$3,327,000 CJ est. value
Wellington, OH 44090

Mill Creek Treatment Plant Fuel Oil Storage Tank Repairs
Infrastructure
Bidding
$300,000 CJ est. value
Cincinnati, OH 45204

RFQ Construction Manager at Risk (CMAR) Services - Rattlesnake WWTP Upgrades Project
Renovation
Bidding
$300,000 CJ est. value
Washington Court House, OH 43160

WWTP - UV Disinfection and Post Aeration Improvements
New Construction
Post-Bid
$308,000 est. value
Jeffersonville, OH 43128

Village of Bainbridge Sanitary Sewer and Wastewater Plant Construction
New Construction, Infrastructure
Post-Bid
Bainbridge, OH

Embshoff Woods Wastewater Improvements
Results
$219,213 est. value
Cincinnati, OH 45238

Village of Rutland Wastewater System Improvements
Results
Rutland, OH

RFP Design - Design and Engineering Services - Erie Express Pump Station Pretreatment Facility
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Springfield, OH 45506

Construct and Repurpose Wastewater Treatment Plant - Ohio EPA
New Construction, Renovation, Infrastructure
Pending Verification
$3,400,000 CJ est. value
Wilmington, OH 45177

Dublin Road Water Plant (DRWP)- Exterior Door and Window Replacement - City of Columbus
Renovation
Conception
$1,500,000 CJ est. value
Columbus, OH 43215

South Water Treatment Plant Concentrate and Raw Water Line Modifications Project
Renovation
Design
$200,000 CJ est. value
Lancaster, OH 43130

Renewable Energy Facility (REF) Programmable Logic Controllers (PLC) Replacement
Renovation
Bidding
$10,000,000 CJ est. value
Valley View, OH 44125

Last Updated 02/28/2023 07:09 PM
Project Title

Water Treatment Plant Filter Addition

Physical Address View project details and contacts
City, State (County) Millersport, OH 43046   (Fairfield County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,233,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally consists of the addition of one (1) 700 gpm combination aeration/detention/filtration unit and related appurtenances at the existing water treatment plant. No Bid will be received unless accompanied by a Bid Guaranty equal to at least 100% of the maximum Bid, or a certified check, cashier's check, or letter of credit equal to at least 10% of the maximum Bid, payable to the Owner as a guarantee that after the Bid is accepted, the Bidder will execute and file the Agreement and 100% Performance and Payment Bonds within 10 days of the Notice of Award. All Contractors and Subcontractors involved with the project will, to the extent practicable, use Ohio products, materials, services, and labor in the implementation of the project. Domestic steel use requirements as specified in Section 153.011 of the Revised Code apply to this project. Bids of corporations not chartered in Ohio must be accompanied by proper certification that the corporation is authorized to do business in Ohio. Contractor compliance with the Equal Employment Opportunity requirements of Ohio Administrative Code Chapter 123, the Governor's Executive Order of 1972, and Governor's Executive Order 84-9 shall be required. Bidders shall comply with the President's Executive Order No. 11246, Equal Employment Opportunity as amended. This procurement is subject to the EPA policy of encouraging the participation of small business in rural areas (SBRA's). The Contractor and all Subcontractors shall pay employees at a rate not less than the minimum wages specified in the current wage determination in accordance with the Davis-Bacon Act. Any Bid may be withdrawn prior to the scheduled closing time for receipt of Bids, but no Bidder shall withdraw his Bid within 80 days after the actual opening thereof. Contract Award shall be made based on the lowest and best Bidder. The Village of Millersport reserves the right to reject any or all bids, to waive any informalities or irregularities in the bids received, and to accept any bid which it deems most favorable. Any bid submittals deemed by the Owner to be incomplete or non-responsive will be rejected. Completion Date: The Work will be substantially completed within 365 calendar days after the date when the Contract Times commence to run as provided in Paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 14.07B of the General Conditions within 395 calendar days after the date when the Contract Times commence to run.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents