Similar Projects
Silver Sands School - Half Cent Sales Tax Capital Program - Okaloosa County School District
Infrastructure, Renovation
Conception
$1,000,000 CJ est. value
Fort Walton Beach, FL 32548

Cross-Town Connector - EN615 - City Of Destin
Infrastructure
Conception
$4,709,000 CJ est. value
Destin, FL 32541

Eglin AFB, Tyndall AFB, Hurlburt Field FY22 MACC
Renovation
Design
$10,000,000 to $20,000,000 est. value
Eglin AFB, Hurlburt Field, Panama City, FL 32403

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Addition/Alteration and Repair Child Development Center, Building 90353
Addition, Demolition, Renovation, Infrastructure - 1,929 SF
Bidding
$5,000,000 CJ est. value
Hurlburt Field, FL 32544

Addition/Alteration and Repair Child Development Center, Building 90353
Addition, Demolition, Renovation, Infrastructure - 1,929 SF
Bidding
$5,000,000 CJ est. value
Hurlburt Field, FL 32544

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Design-Build and Design-Bid-Build Indefinite-Delivery Indefinite-Quantity Multiple Award Construction Contract for Naval Facilities Engineering Command Southeast Area of Operations N69450-20-R-0097
Results
$20,000,000 to $100,000,000 est. value

Convert Mini-Mall to Admin Facility, Bldg. 90228
Renovation
Results
$250,000 to $500,000 est. value
Hurlburt Field, FL

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Edge Elementary School - Building Refresh - Half Cent Sales Tax Capital Program - Okaloosa County School District
Renovation, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Niceville, FL 32578

Lance C. Richbourg School - Half Cent Sales Tax Capital Program - Okaloosa County School District
Renovation, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Crestview, FL 32536

Pickleball Courts - RC127 - City Of Destin
Infrastructure
Conception
$340,000 CJ est. value
Destin, FL 32541

Last Updated 05/03/2023 01:13 PM
Project Title

RFQ D/B - Design Build Building 73 Lab Expansion, Eglin Air Force Base

Physical Address View project details and contacts
City, State (County) Eglin, FL 32542   (Okaloosa County)
Category(s) Government/Public, Heavy and Highway, Laboratory
Sub-Category(s) Laboratory, Military Facility, Site Development
Contracting Method Design-Build Firm to Subcontract, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $6,541,848 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Award Date: Apr 27, 2023 Contract Award Number: W9127823C0008 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: FE24DCBHDYQ1 Contractor Awarded Name: Speegle Construction, Inc. Contractor Awarded Address: Niceville, FL 32578-1893 USA Base and All Options Value (Total Contract Value): $6,541,848.00 Construction of New Facility Addition and Alterations shall constitute full compensation for furnishing and installation of all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the construction of the Building 73 Facility Addition and alterations in accordance with the contract document drawings and specifications. All new communications network cabling will be installed to the existing buildings Comm Room. New 480V, 3 phase and 208V, 3 phase electrical services will be installed to the new facility addition which will back feed the existing electrical service panels. ACS, IDS, CCTV, and pink noise systems will be GFGI with the contractor installing all power and pathways for these systems. The contractor shall be responsible for the demolition of fire alarm and mass notification devices within the existing facility as indicated on the contract document drawings as well as the patching and painting of the walls and replacement of ceiling tiles associated with this task. Additionally, a new LED text sign shall be installed within the existing facility as indicated on the contract document drawings. The fire alarm and mass notification system for the building addition shall be an extension of the existing fire alarm and mass notification system. Payment under Bid Item Construction of Site Work shall constitute full compensation for furnishing and installation of all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the construction of the work beyond the 5-foot building lines of the facility in accordance with contract document drawings and specifications. Work includes but not limited to; clearing, grubbing, and grading the site, demolition of existing site improvements and utilities, site improvements, hauling fill material, the installation of all exterior utilities (except for ASUS and CHELCO), sidewalks and pavements, stormwater structures and management facilities, sod landscaping, and site improvements. The contractor shall also be responsible for the installation of the fire service supply line, saw cutting and patching of pavements, sidewalks and restoration of damaged landscaping, dewatering, testing, and cathodic protection related to utility systems installation or demolition as a part of the base bid costs. Privatized Utility Authority (ASUS) Water and Wastewater Work will constitute full compensation for the payment in the amount shown on the bid schedule to the privatized utility authority, American States Utility Services (ASUS) for their work to provide and install the privatized water and wastewater system for the Building 73 Facility to the point of demarcation as defined in Appendix E, American States Utility Service, Inc. Water and/or Sewer Service Connection Standard Manual, Section 1.3. Addition and connections to the existing water and sanitary sewer systems including but not limited to trenching, dewatering, filling and compaction for installation of the water and sewer system service components. ASUS will saw-cut existing pavements to perform the installation of piping, remove the pavement from the pipe trench, pavement debris will be left to the side of the work area to be removed and disposed by Contractor. ASUS will install pipes, backfill & compact the utility trenches, and rough grade only. Contractor shall be responsible for patching of pavements, sidewalks and restoration of any damaged landscaping related to the water and sewer line service utility system installation as part of the Base Bid costs. All erosion and sedimentation control measures, dewatering, final site grading, restoration of pavements, and installation of grass sod work for the area of the site impacted by utility installation will be completed by the Contractor. All soils and materials testing, if required, shall be provided by Contractor. Contractor shall coordinate with ASUS to schedule the installation of this work to be completed within the required Construction Completion duration and make payment to ASUS for the amount shown on the bid schedule. The cost for materials, labor, equipment, and other appurtenances related to the fire line construction are not included in the ASUS work and connection fee. A cathodic protection system shall be provided for the new water domestic lines and fire service supply lines. Contractor shall provide the materials, labor, equipment, and appurtenances for the installation of cathodic protection for the new water domestic lines and fire service supply lines. Privatized Utility Authority (CHELCO) Site Electrical Work will constitute full compensation for the payment in the amount shown on the bid schedule to Choctawhatchee Electrical Cooperative (CHELCO) for their work to provide and install the privatized exterior primary power system supporting the Building 73 Facility Addition. CHELCO to install new 750KVA and 1000KVA pad mount transformers along with associated primary rework needed for the install. CHELCO will modify the existing transformer pads as required. Installed work shall be built to CHELCO standards and specs. Work does not include metering or secondary. All work downstream from the transformer (to include metering and secondary) is the responsibility of the Contractor.

Details

7,000 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Office Furniture, Institutional Furniture, Laboratory Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents