Similar Projects
Hinsdale Road Reconstruction - City of Fayetteville
Infrastructure
Conception
$1,394,724 CJ est. value
Fayetteville, NC 28305

Little Cross Creek Greenway - Phases I and II - City of Fayetteville
Infrastructure
Conception
$510,000 CJ est. value
East Fayetteville, NC 28301

StayApt Suites / Fayetteville
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Fayetteville, NC 28303

COMET Bridge Extension J And A
Infrastructure
Design
$1,000,000 CJ est. value
Fort Bragg, NC 28310

Sunbury Drive Drainage Improvements
Infrastructure
Bidding
$1,000,000 CJ est. value
Fayetteville, NC 28311

Various Sewer Manhole Rehabilitation Polymeric Epoxy
Infrastructure
Bidding
$2,000,000 CJ est. value
East Fayetteville, NC 28301

RFQ Contractor - FSU - New Residence Hall
New Construction, Infrastructure - 87,930 SF
Sub-Bidding
$27,462,751 CJ est. value
East Fayetteville, NC 28301

PN92793 JSOC (Joint Special Operations Command ) Operations Facility Annex
New Construction, Infrastructure - 25,260 SF
Post-Bid
$25,000,000 CJ est. value
Fort Bragg, NC 28310

Fayetteville Fire Department New Sub-station No. 4
New Construction, Infrastructure
Post-Bid
$7,300,000 CJ est. value
Fayetteville, NC 28303

Water Main Extension Project
Infrastructure
Results
$1,665,690 CJ est. value
Godwin, NC 28344

Construction of Greenock Avenue
Infrastructure
Results
$198,749 CJ est. value
Fayetteville, NC 28304

Grading, Drainage, Paving, Signing, Signals, and Structures
Infrastructure
Construction
$151,850,000 CJ est. value
Fayetteville, NC 28306

Taco Bell / Fayetteville
New Construction, Infrastructure - 2,362 SF
Construction
$1,750,000 CJ est. value
Fayetteville, NC 28306

Raptor Tactical Storage
New Construction, Infrastructure - 10,800 SF
Pending Verification
$1,000,000 CJ est. value
Spring Lake, NC 28390

Taxiway F Pavement and Lighting Rehabilitation - City of Fayetteville
Infrastructure
Conception
$4,000,000 CJ est. value
Fayetteville, NC 28306

Last Updated 10/05/2023 10:09 AM
Project Title

Caliber Collision / Spring Lake

Physical Address View project details and contacts
City, State (County) Spring Lake, NC 28390   (Cumberland County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Sub-Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $2,500,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Project scope includes but is not limited to site work, paving and construction of a new auto body repair facility. Construction is anticipated to begin between mid-November and mid-December. Cost savings suggestions are highly encouraged. Please let GC know if you ahve any ideas to consider.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents