Similar Projects
Coliseum Medical Centers Freestanding Emergency Department
New Construction, Infrastructure
Conception
$11,928,250 CJ est. value
Bonaire, GA 31005

Lake Joy Primary and Elementary Site Upgrades
Infrastructure
Bidding
$300,000 CJ est. value
Warner Robins, GA 31088

Install Construct Breakroom and Administrative Area Building 125
Addition, Demolition, Renovation, Infrastructure
Bidding
$25,000,000 CJ est. value
Robins AFB, GA 31098

Perry Fieldhouse Site Improvements
Infrastructure
Post-Bid
GA

Matt Arthur Elementary Parent Drop Off Improvements
Infrastructure
Post-Bid
Kathleen, GA 31047

Site Clearing Of Retention Ponds
Alteration
Results
Warner Robins, GA

Aquatic Center Site Work
Infrastructure
Results
GA

CRH Healthcare Shell Building / Bonaire
New Construction, Infrastructure - 4,000 SF
Construction
$800,000 CJ est. value
Bonaire, GA 31005

Bob White Storage Expansion / Perry
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$500,000 CJ est. value
Perry, GA 31069

Jack Link's Manufacturing Faculty
New Construction, Infrastructure
Pending Verification
$450,000,000 CJ est. value
Perry, GA 31069

Thomson Middle School Track Repaving
Infrastructure
Bidding
$200,000 CJ est. value
Centerville, GA 31028

RFP Design - Perry DDA Downtown Lot
New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Perry, GA 31069

Sidewalk Work for Martin Luther King, Jr. Boulevard
Infrastructure
Results
$40,100 CJ est. value
Warner Robins, GA 31098

RFQ - Downtown Mixed Use Facility
New Construction, Infrastructure
Pending Verification
$5,280,000 CJ est. value
Perry, GA 31069

Water System Improvements to Serve AE Harris Road Phase II
Infrastructure
Bidding
$600,000 CJ est. value
Perry, GA 31069

Last Updated 03/20/2023 03:42 PM
Project Title

Ashley Drive Multi-Residential Development

Physical Address View project details and contacts
City, State (County) Perry, GA 31069   (Houston County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected July 2021
Bids Due View project details and contacts
Estimated Value $93,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 250-unit multi-residential development. As of January 15, 2021, this project is in planning. The project is going through the re-zoning process. It went before the Perry City Council for only a public hearing on October 6, 2020. No architect or general contractor information has been released. A firm timeline has not been established, however, construction could commence summer 2021.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents